Liebert XDK user manual Proper Application, Operating Conditions, General operating data

Page 6

Operating Conditions

2.0OPERATING CONDITIONS

2.1Proper Application

The XDK is a water-cooled enclosure and is intended for removing heat from electronic equipment inside the cabinet. The cooling system in the cabinet is thermally independent of the room air. Water is used to cool equipment installed in the XDK. No additional cooling of the server room is required.

NOTE

Under certain conditions, a small amount of heat, (approximately 0.5kW), can escape into the room.

! CAUTION

Risk of improper operation. Can cause equipment damage. For reliable function of the XDK, cold water must be available in the correct amount, and at the correct temperature and pressure. Observe water quality specified in VGB-R 455 P. (see 8.0 - Water Purity Requirements ).

Table 1

General operating data

 

 

 

 

Ambient temperature

50°F to 95°F (10°C to 35°C)

(other temperatures upon request)

 

 

Absolute humidity in the installation location

8g H2O/ kg air maximum

Water temperature, supply

54°F (12°C); other temperatures upon request

 

 

Water temperature, return

64°F (18°C); other temperatures upon request

 

 

Water connection

from below

 

 

Condensed water connection

from below

 

 

Nominal voltage

200V to 264V (50Hz and 60 Hz)

 

 

Maximum operating pressure

145 PSI (10 bar)

 

 

 

2

Image 6
Contents UserManual-17kW Important Safety Instructions Table of Contents Figures Introduction Proper Application Operating ConditionsGeneral operating data General function DescriptionPrinciple of Cooling Operation Air / WaterHeat Exchanger Technical data Data Overview-XDKXDK general data Control Automatic Door OpeningFunction Initial CommissioningManual Closing Manual OpeningPackaging Material HandlingEquipment INSPECTION, Handling and Storage Storage Returning the Unit in Case of DamagePositioning the XDK Preparation for InstallationInstallation and Commissioning Remove Recirculation Air Duct Transport LockWater Connection Preparing Heat Exchanger for Initial CommissioningTop View Rear Preparations for ConnectingCondensed Water Connection FrontElectrical Connection Sealing the CabinetServicing and Maintenance Fan ReplacementGeneral Inspection on Fans-Annual Reinstall the fan by reversing the steps to remove the fan Inspect the Heat Exchanger-AnnualHeat exchanger replacement Replacing the Heat ExchangerDismantling and Disposal Water Purity Requirements Prevalent impurities and removal methodsSuggested hydrologic levels Unit Installation Checklist Nominal values at setup site Commissioning CertificateXDK Commissioning certificate Configuration Type of cabinetControl of status Cold water facility on site Electrical data / documentsFunction check GPM Water Purity Requirements Page Ti n Ne tIti That