Liebert XDK user manual Cold water facility on site, Electrical data / documents, Function check

Page 28

Water Purity Requirements

Table 10 Cold water facility on site

Cold Water

 

 

 

 

 

 

 

 

 

XDK Connected To

 

 

 

 

 

 

 

 

 

Water Temperature

 

Feed

°C/°F

Return

 

 

 

 

 

Water Pressure

Feed

PSI (Pa)

Return

PSI (Pa)

 

 

 

 

 

Water Differential Pressure

Pa

 

 

 

 

 

 

 

 

Table 11 Electrical data / documents

Wiring Scheme Attached

Yes

No

 

 

 

Comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Connections Checked:

Yes

No

 

 

 

Electrical Acceptance Certificate

Yes

No

by Approved Staff

 

 

Comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

.

 

 

Table 12 Function check

 

 

 

 

 

Function of All Fans

Yes

No

(Air Blowing Direction)

 

 

Fans Shut Down When Rear Door

Yes

No

is Opened

 

 

Comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Function Three Way Valve

Yes

No

 

 

 

Comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Door Opens When ____ °F (°C) is

Yes

No

Reached

 

 

Comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24

Image 28
Contents UserManual-17kW Important Safety Instructions Table of Contents Figures Introduction Operating Conditions Proper ApplicationGeneral operating data General function DescriptionAir / Water Principle of Cooling OperationHeat Exchanger Data Overview-XDK Technical dataXDK general data Control Automatic Door OpeningFunction Initial CommissioningManual Closing Manual OpeningHandling Packaging MaterialEquipment INSPECTION, Handling and Storage Storage Returning the Unit in Case of DamagePreparation for Installation Installation and CommissioningPositioning the XDK Remove Recirculation Air Duct Transport LockWater Connection Preparing Heat Exchanger for Initial CommissioningTop View Preparations for Connecting Condensed Water ConnectionRear FrontElectrical Connection Sealing the CabinetFan Replacement Servicing and MaintenanceGeneral Inspection on Fans-Annual Reinstall the fan by reversing the steps to remove the fan Inspect the Heat Exchanger-AnnualHeat exchanger replacement Replacing the Heat ExchangerDismantling and Disposal Prevalent impurities and removal methods Water Purity RequirementsSuggested hydrologic levels Unit Installation Checklist Commissioning Certificate Nominal values at setup siteXDK Commissioning certificate Type of cabinet ConfigurationControl of status Electrical data / documents Cold water facility on siteFunction check GPM Water Purity Requirements Page Ne t ItiTi n That