Liebert XDK user manual Configuration, Type of cabinet, Control of status

Page 27

Water Purity Requirements

Configuration

Table 8 Type of cabinet

XDK 17kW

Cabinet Number

Serial Number

Date Shipped

Fan

Type

Table 9

Control of status

 

 

General Condition

 

 

 

 

 

Load Carrying Capacity Checked

Yes

No

 

 

 

Level Alignment Checked

Yes

No

 

 

 

Transportation Damages of Cabinet

Yes

No

 

 

 

 

Comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Damages on Heat Exchanger/Connections

Yes

No

 

 

 

Front Door Closing Easily

Yes

No

 

 

 

 

Comments:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rear Door Closing Easily

Yes

No

 

 

 

 

Comments:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Entries Closed

Yes

No

 

 

 

 

Comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Condensate Drain Open / Connected

Yes

No

 

 

 

 

Comments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Trap Filled Up

Yes

No

 

 

 

Packaging Removed

Yes

No

 

 

 

Installation Tools Removed

Yes

No

 

 

 

Air Separation

Yes

No

(Front Panels Closed)

 

 

Cable Entries Air Tight

Yes

No

 

 

 

 

23

Image 27
Contents UserManual-17kW Important Safety Instructions Table of Contents Figures Introduction Proper Application Operating ConditionsGeneral operating data Description General functionPrinciple of Cooling Operation Air / WaterHeat Exchanger Technical data Data Overview-XDKXDK general data Automatic Door Opening ControlInitial Commissioning FunctionManual Opening Manual ClosingPackaging Material HandlingEquipment INSPECTION, Handling and Storage Returning the Unit in Case of Damage StorageRemove Recirculation Air Duct Transport Lock Preparation for InstallationInstallation and Commissioning Positioning the XDKPreparing Heat Exchanger for Initial Commissioning Water ConnectionTop View Front Preparations for ConnectingCondensed Water Connection RearSealing the Cabinet Electrical ConnectionServicing and Maintenance Fan ReplacementGeneral Inspection on Fans-Annual Inspect the Heat Exchanger-Annual Reinstall the fan by reversing the steps to remove the fanReplacing the Heat Exchanger Heat exchanger replacementDismantling and Disposal Water Purity Requirements Prevalent impurities and removal methodsSuggested hydrologic levels Unit Installation Checklist Nominal values at setup site Commissioning CertificateXDK Commissioning certificate Configuration Type of cabinetControl of status Cold water facility on site Electrical data / documentsFunction check GPM Water Purity Requirements Page That Ne tIti Ti n