Installation
2.0INSTALLATION
2.1Inspection
Upon receiving the UPS, examine the packaging for any signs of mishandling or damage. If any dam- age is noted, call your local dealer or Liebert representative and/or notify your carrier.
2.1.1Environment
NOTE
Operating in temperatures above 77°F (25°C) will reduce battery life. The UPS environment must be free of conductive contaminants and excessive moisture (water and condensation), flammable vapors, chemical fumes, corrosive gases and liquids.
2.1.2Required Setup Equipment
The tools below are required to properly set up your UPS:
•Pallet jack
•1/2" (13mm) ratchet or wrench
•Torque wrench
•Flathead screwdriver
•#2 Phillips screwdriver
2.1.3Site Preparation
When deciding where to locate your UPS, consider the weight and size of the unit. Make sure that the structural integrity of the floor can withstand the weight of a fully loaded unit.
Check to make sure that your UPS will be located in a
12"
(305mm)
36"
(915 mm)
The unit frame is bolted to the shipping pallet to ensure safety. It is recommended that a pallet jack be used to transport the unit to its operating location (prior to unbolting the unit).
8