Enterasys Networks C2H124-48P Rack Mounting the Switch, Guidelines for Rackmount Installation

Page 41

Rack Mounting the Switch

Rack Mounting the Switch

To install the switch in a 19‐inch rack, you need:

Two rackmount brackets and mounting screws shipped with the switch.

Four user‐supplied screws to attach the switch to a standard 19‐inch rack.

Guidelines for Rackmount Installation

The installation site must be within reach of the network cabling and meet the requirements listed below:

Appropriate grounded power receptacles must be located within 152 cm (5 feet) of the location.

A temperature of between 5°C (41°F) and 40°C (104°F) must be maintained at the installation site with fluctuations of less than 10°C (18°F) per hour.

Caution: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.

Precaución: Para asegurar una buena ventilación y evitar que el sistema sesobrecaliente, deje un espacio mínimo de 5.1 cm (2 pulgadas) con respecto a los lados y a la parte posterior del aparato.

Warning: Before installing the chassis into a rack, ensure that the rack can support the device(s) without compromising the stability of the rack. Otherwise, personal injury and/or equipment damage may result.

Advertencia: Antes de instalar el chassis en un rack, asegurarse que el rack puede soportar el(los) dispositivo(s) sin comprometer la estabilidad del mismo. De otra forma puede suceder algun tipo de daño personal o del equipo.

Warnhinweis: Schützen Sie sich vor Verletzungen und Geräteschaden, überzeugen Sie sich vor der Installation des Chassis in das Rack, von dessen Stabilität.

Attaching Brackets and Installing in Rack

Proceed as follows to install the switch into a 19‐inch rack:

1.Attach the rackmount brackets to the switch, as shown in Figure 3‐5, using the eight M3 x 6 mm flathead screws shipped with the switch.

SecureStack C2 Installation Guide 3-9

Image 41
Contents Enterasys SecureStack C2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv Who Should Use This Guide About This GuideRelated Documents How to Use This GuideFollowing conventions are used in this guide Conventions Used in This GuidePage Overview IntroductionC2G124-48P Stackable Switch C2G124-48P Stackable Switch C2H124-48P Stackable SwitchHigh-Speed Stack Connections C2H124-48P Stackable SwitchPowered Device Classifications Usage PD Maximum Power Range PoE Power over Ethernet SupportRedundant Power Supply Capability Connectivity Switch Configuration Using WebViewManagement Description of Mini-GBICsSwitch Configuration Using CLI Commands Lanview Diagnostic LEDsStandards Compatibility Getting HelpGetting Help Network Requirements 1000BASE-FX Network 10BASE-TX Network100BASE-TX Network 1000BASE-T Network 1000BASE-T Network Network Requirements Hardware Installation Unpacking the Switch Considerations Prior to InstallationContents of Switch Carton Quantity Required ToolsPreparing to Install a Mini-GBIC Installing Optional Mini-GBICsMini-GBIC with MT-RJ Connector Mini-GBIC with LC Connector Removing a Mini-GBIC Installing the Switch on a Flat SurfaceChassis Bottom, Rubber Feet Placement Installing the Rubber FeetArea Guidelines for Switch Installation on Flat Surface Guidelines for Flat Surface InstallationAttaching Brackets and Installing in Rack Rack Mounting the SwitchGuidelines for Rackmount Installation Attaching the Rackmount Brackets Connecting High-Speed Stacking CablesHigh-Speed Stacking Cable Connections About SecureStack C2 Switch Operation in a Stack Configuring Switches in a StackInstalling a New Stackable System of Up to Eight Switches Recommended Procedures to Install New and Existing StacksImportant Considerations About Using Clear Config in a Stack Switch Rear View Connecting AC and PoE PowerStack Initialization Overview PoE PowerWhat Is Needed Connecting to Console Port for Local ManagementParameter Setting Connecting to an IBM or Compatible Device10 Connecting an IBM PC or Compatible Connecting to a VT Series Terminal11 Connecting a VT Series Terminal Connecting to a ModemConnecting UTP Cables Connecting to the Network13 Connecting a UTP Cable Segment to RJ45 port 14 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1- TX2+ TX3+ RX3- RX2- TX4+ RX4 Connecting Fiber-Optic Cables to MT-RJ Ports C2G124 Connecting Fiber-Optic Cables to LC Ports Connecting to the Network 19 Cable Connection to LC Fiber-Optic Connectors Initial Logon to Switch Management Completing the InstallationTroubleshooting C2G124-48P Lanview LEDs Using LanviewC2H124-48P Lanview LEDs Color State Recommended Action Lanview LED Diagnostic IndicationsRPS Mgbic Refer to the SecureStack C2 Configuration Guide for the IP Troubleshooting ChecklistReset Button Using the Reset ButtonUsing the Reset Button Using the Reset Button Troubleshooting Table A-1 Switch Specifications ItemSpecification C2G124-48P/C2H124-48P Switch SpecificationsProcessors/Memory Table A-1 Switch Specifications C2H124-48PTable A-2 Mini-GBIC Input/Output Port Specifications Mini-GBIC Input/Output SpecificationsMGBIC-LC03 Specifications 1000BASE-LX Gigabit Ethernet SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LX MGBIC-02 Specifications 1000BASE-T MGBIC-08 Specifications 1000BASE-ELXTable A-9 MGBIC-08 Optical Specifications Table A-11 MGBIC-02 SpecificationsTable A-12 Compliance Standards Regulatory Compliance Console Port Pinout AssignmentsRegulatory Compliance Regulatory Compliance Specifications Index Index-2