Enterasys Networks C2G124-48P, C2H124-48P Connecting to a Modem, Connecting a VT Series Terminal

Page 52

Connecting to Console Port for Local Management

Figure 3-11 Connecting a VT Series Terminal

45

 

46

45

47

 

48 7

C2G124-48P

Console

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ä

 

 

Ã

 

Á

À

Â

1

DB9 female cable connector

4

DB25 female connector

 

 

2

Serial interface cable

5

PC with VT emulation application

3DB9 male Console port connector

Connecting to a Modem

To connect a modem to an Enterasys Networks switch modem port (Figure 3‐12), use a UTP cable terminated with a DB9 female connector and a DB25 male connector, and proceed as follows:

1.Connect the DB9 female connector at one end of the cable to the Console port on the Enterasys switch. (If there is a switch designated as the Manager, connect to its Console port.)

2.Plug the DB25 male connector at the other end of the cable into the modem communications port.

3.Turn on the modem and make sure the remote modem is ON.

4.With your PC connected to the remote modem, configure your VT emulation package with the following parameters:

Parameter

Setting

 

 

 

Mode

7

Bit Control

 

 

Transmit

Transmit=9600

 

 

 

Bits Parity

8

Bits, No Parity

 

 

 

Stop Bit

1

Stop Bit

 

 

 

3-20 Hardware Installation

Image 52
Contents Enterasys SecureStack C2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsConventions Used in This Guide Following conventions are used in this guidePage Introduction OverviewC2G124-48P Stackable Switch C2H124-48P Stackable Switch C2G124-48P Stackable SwitchC2H124-48P Stackable Switch High-Speed Stack ConnectionsRedundant Power Supply Capability PoE Power over Ethernet SupportPowered Device Classifications Usage PD Maximum Power Range Switch Configuration Using WebView ConnectivityManagement Description of Mini-GBICsLanview Diagnostic LEDs Switch Configuration Using CLI CommandsStandards Compatibility Getting HelpGetting Help Network Requirements 100BASE-TX Network 10BASE-TX Network1000BASE-FX Network 1000BASE-T Network 1000BASE-T Network Network Requirements Hardware Installation Considerations Prior to Installation Unpacking the SwitchContents of Switch Carton Quantity Required ToolsInstalling Optional Mini-GBICs Preparing to Install a Mini-GBICMini-GBIC with MT-RJ Connector Mini-GBIC with LC Connector Installing the Switch on a Flat Surface Removing a Mini-GBICInstalling the Rubber Feet Chassis Bottom, Rubber Feet PlacementGuidelines for Flat Surface Installation Area Guidelines for Switch Installation on Flat SurfaceGuidelines for Rackmount Installation Rack Mounting the SwitchAttaching Brackets and Installing in Rack Connecting High-Speed Stacking Cables Attaching the Rackmount BracketsHigh-Speed Stacking Cable Connections Configuring Switches in a Stack About SecureStack C2 Switch Operation in a StackRecommended Procedures to Install New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesImportant Considerations About Using Clear Config in a Stack Connecting AC and PoE Power Switch Rear ViewPoE Power Stack Initialization OverviewConnecting to Console Port for Local Management What Is NeededConnecting to an IBM or Compatible Device Parameter SettingConnecting to a VT Series Terminal 10 Connecting an IBM PC or CompatibleConnecting to a Modem 11 Connecting a VT Series TerminalConnecting to the Network Connecting UTP Cables13 Connecting a UTP Cable Segment to RJ45 port 14 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1- TX2+ TX3+ RX3- RX2- TX4+ RX4 Connecting Fiber-Optic Cables to MT-RJ Ports C2G124 Connecting Fiber-Optic Cables to LC Ports Connecting to the Network 19 Cable Connection to LC Fiber-Optic Connectors Completing the Installation Initial Logon to Switch ManagementTroubleshooting Using Lanview C2G124-48P Lanview LEDsC2H124-48P Lanview LEDs Lanview LED Diagnostic Indications Color State Recommended ActionRPS Mgbic Troubleshooting Checklist Refer to the SecureStack C2 Configuration Guide for the IPUsing the Reset Button Reset ButtonUsing the Reset Button Using the Reset Button Troubleshooting C2G124-48P/C2H124-48P Switch Specifications Table A-1 Switch Specifications ItemSpecificationTable A-1 Switch Specifications C2H124-48P Processors/MemoryMini-GBIC Input/Output Specifications Table A-2 Mini-GBIC Input/Output Port SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX Gigabit Ethernet SpecificationsMGBIC-LC03 Specifications 1000BASE-LX MGBIC-LC09 Specifications 1000BASE-LX MGBIC-08 Specifications 1000BASE-ELX MGBIC-02 Specifications 1000BASE-TTable A-9 MGBIC-08 Optical Specifications Table A-11 MGBIC-02 SpecificationsRegulatory Compliance Console Port Pinout AssignmentsTable A-12 Compliance Standards Regulatory Compliance Regulatory Compliance Specifications Index Index-2