Enterasys Networks C2G124-48P Completing the Installation, Initial Logon to Switch Management

Page 62

Completing the Installation

Completing the Installation

After installing the switch and making the connections to the network, access the switch management, as described below.

Initial Logon to Switch Management

To initially access switch management from your local PC, terminal, or modem connection, proceed as follows at the displayed startup screen:

1.Enter rw (Read‐Write) for Username.

2.At the Password prompt, press ENTER (RETURN).

3.For details on how to configure the switch using the command line interface, refer to the SecureStack C2 Configuration Guide. The CLI commands enable you to set a new password and perform more involved management configurations on the switch. One of many capabilities is to reconfigure the stack, reassigning the Manager function to another switch and configuring the order of Member switches that will take over the stack management functions in case the operating Manager is powered down, malfunctions, or is removed from the stack.

4.After the initial configuration, you can also use WebView (Enterasys Networks’ embedded web server) for configuration and management tasks.

All the guides associated with the switch are available online at: http://www.enterasys.com/support/manuals

Once you are confident that the installation is successful, route and secure your cables. If you require assistance, contact Enterasys Networks using one of the methods described in “Getting Help” on page 1‐7.

3-30 Hardware Installation

Image 62
Contents Enterasys SecureStack C2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsConventions Used in This Guide Following conventions are used in this guidePage Introduction OverviewC2G124-48P Stackable Switch C2H124-48P Stackable Switch C2G124-48P Stackable SwitchC2H124-48P Stackable Switch High-Speed Stack ConnectionsPowered Device Classifications Usage PD Maximum Power Range PoE Power over Ethernet SupportRedundant Power Supply Capability Management Switch Configuration Using WebViewConnectivity Description of Mini-GBICsStandards Compatibility Lanview Diagnostic LEDsSwitch Configuration Using CLI Commands Getting HelpGetting Help Network Requirements 1000BASE-FX Network 10BASE-TX Network100BASE-TX Network 1000BASE-T Network 1000BASE-T Network Network Requirements Hardware Installation Contents of Switch Carton Quantity Considerations Prior to InstallationUnpacking the Switch Required ToolsInstalling Optional Mini-GBICs Preparing to Install a Mini-GBICMini-GBIC with MT-RJ Connector Mini-GBIC with LC Connector Installing the Switch on a Flat Surface Removing a Mini-GBICInstalling the Rubber Feet Chassis Bottom, Rubber Feet PlacementGuidelines for Flat Surface Installation Area Guidelines for Switch Installation on Flat SurfaceAttaching Brackets and Installing in Rack Rack Mounting the SwitchGuidelines for Rackmount Installation Connecting High-Speed Stacking Cables Attaching the Rackmount BracketsHigh-Speed Stacking Cable Connections Configuring Switches in a Stack About SecureStack C2 Switch Operation in a StackRecommended Procedures to Install New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesImportant Considerations About Using Clear Config in a Stack Connecting AC and PoE Power Switch Rear ViewPoE Power Stack Initialization OverviewConnecting to Console Port for Local Management What Is NeededConnecting to an IBM or Compatible Device Parameter SettingConnecting to a VT Series Terminal 10 Connecting an IBM PC or CompatibleConnecting to a Modem 11 Connecting a VT Series TerminalConnecting to the Network Connecting UTP Cables13 Connecting a UTP Cable Segment to RJ45 port 14 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1- TX2+ TX3+ RX3- RX2- TX4+ RX4 Connecting Fiber-Optic Cables to MT-RJ Ports C2G124 Connecting Fiber-Optic Cables to LC Ports Connecting to the Network 19 Cable Connection to LC Fiber-Optic Connectors Completing the Installation Initial Logon to Switch ManagementTroubleshooting Using Lanview C2G124-48P Lanview LEDsC2H124-48P Lanview LEDs Lanview LED Diagnostic Indications Color State Recommended ActionRPS Mgbic Troubleshooting Checklist Refer to the SecureStack C2 Configuration Guide for the IPUsing the Reset Button Reset ButtonUsing the Reset Button Using the Reset Button Troubleshooting C2G124-48P/C2H124-48P Switch Specifications Table A-1 Switch Specifications ItemSpecificationTable A-1 Switch Specifications C2H124-48P Processors/MemoryMini-GBIC Input/Output Specifications Table A-2 Mini-GBIC Input/Output Port SpecificationsMGBIC-LC03 Specifications 1000BASE-LX Gigabit Ethernet SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LX Table A-9 MGBIC-08 Optical Specifications MGBIC-08 Specifications 1000BASE-ELXMGBIC-02 Specifications 1000BASE-T Table A-11 MGBIC-02 SpecificationsTable A-12 Compliance Standards Regulatory Compliance Console Port Pinout AssignmentsRegulatory Compliance Regulatory Compliance Specifications Index Index-2