Enterasys Networks C2G124-48P, C2H124-48P manual Stack Initialization Overview, PoE Power

Page 48

Connecting AC and PoE Power

3.Observe the power CPU LED (not shown) located on the front panel. During the initialization, the CPU LED will start by illuminating solid amber, then start blinking green, then blinking amber, then blinking green again until the end of the initialization, and then turns solid green.

Note: If the CPU LED illuminates solid red, there was a critical failure. For more information about the LED indications and troubleshooting, refer to Chapter 4. If you need additional help, contact Enterasys Networks. Refer to “Getting Help” on page 1-7 for details.

If the switch is a standalone unit, it will take approximately 30 seconds for the switch to start up. If the switch is a stack Manager, it can take up to 3 minutes or more to start up, depending on the number of Member switches in the stack.

PoE Power

If you are installing an optional SecureStack C2 PoE redundant power supply (C2RPS‐ POE), refer to the installation instructions supplied with the C2RPS‐POE. The switch is connected to a C2RPS‐POE using a C2RPS‐POE Cable.

Caution: The C2G124-48P and C2H124-48P are PoE-compliant devices. Do not connect a SecureStack C2 Redundant Power System (C2RPS-SYS) to the power connector. Otherwise damage to the device may result.

Precaución: Los dispositivos C2G124-48P y C2H124-48P cumplen con el estándar PoE (power over ethernet). No conecte una fuente de poder redundante SecureStack C2 (C2RPS-SYS) al cable de corriente. De lo contrario, el dispositivo puede dañarse.

If you are installing the switch as a standalone device, proceed to “Connecting to Console Port for Local Management” on page 3‐17. If you are installing switches in a stack configuration, proceed to “Stack Initialization Overview” on page 3‐16.

Stack Initialization Overview

When you install and connect all the high‐speed stacking cables to the switches in the stack before applying power to the switches, the following occurs:

The switch that will manage (Manager) the stack is automatically established with all other switches established as Member switches in the stack. When the switches complete their initializations, one of the switches in the stack will illuminate its Manager LED, indicating that it is the stack Manager. The Manager LED on each Member switch will be off.

The hierarchy of the switches that will function as backup Manager is also determined in case the current Manager malfunctions, is powered down, or is disconnected from the stack.

3-16 Hardware Installation

Image 48
Contents Enterasys SecureStack C2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsConventions Used in This Guide Following conventions are used in this guidePage Introduction OverviewC2G124-48P Stackable Switch C2H124-48P Stackable Switch C2G124-48P Stackable SwitchC2H124-48P Stackable Switch High-Speed Stack ConnectionsPoE Power over Ethernet Support Redundant Power Supply CapabilityPowered Device Classifications Usage PD Maximum Power Range Switch Configuration Using WebView ConnectivityManagement Description of Mini-GBICsLanview Diagnostic LEDs Switch Configuration Using CLI CommandsStandards Compatibility Getting HelpGetting Help Network Requirements 10BASE-TX Network 100BASE-TX Network1000BASE-FX Network 1000BASE-T Network 1000BASE-T Network Network Requirements Hardware Installation Considerations Prior to Installation Unpacking the SwitchContents of Switch Carton Quantity Required ToolsInstalling Optional Mini-GBICs Preparing to Install a Mini-GBICMini-GBIC with MT-RJ Connector Mini-GBIC with LC Connector Installing the Switch on a Flat Surface Removing a Mini-GBICInstalling the Rubber Feet Chassis Bottom, Rubber Feet PlacementGuidelines for Flat Surface Installation Area Guidelines for Switch Installation on Flat SurfaceRack Mounting the Switch Guidelines for Rackmount InstallationAttaching Brackets and Installing in Rack Connecting High-Speed Stacking Cables Attaching the Rackmount BracketsHigh-Speed Stacking Cable Connections Configuring Switches in a Stack About SecureStack C2 Switch Operation in a StackRecommended Procedures to Install New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesImportant Considerations About Using Clear Config in a Stack Connecting AC and PoE Power Switch Rear ViewPoE Power Stack Initialization OverviewConnecting to Console Port for Local Management What Is NeededConnecting to an IBM or Compatible Device Parameter SettingConnecting to a VT Series Terminal 10 Connecting an IBM PC or CompatibleConnecting to a Modem 11 Connecting a VT Series TerminalConnecting to the Network Connecting UTP Cables13 Connecting a UTP Cable Segment to RJ45 port 14 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1- TX2+ TX3+ RX3- RX2- TX4+ RX4 Connecting Fiber-Optic Cables to MT-RJ Ports C2G124 Connecting Fiber-Optic Cables to LC Ports Connecting to the Network 19 Cable Connection to LC Fiber-Optic Connectors Completing the Installation Initial Logon to Switch ManagementTroubleshooting Using Lanview C2G124-48P Lanview LEDsC2H124-48P Lanview LEDs Lanview LED Diagnostic Indications Color State Recommended ActionRPS Mgbic Troubleshooting Checklist Refer to the SecureStack C2 Configuration Guide for the IPUsing the Reset Button Reset ButtonUsing the Reset Button Using the Reset Button Troubleshooting C2G124-48P/C2H124-48P Switch Specifications Table A-1 Switch Specifications ItemSpecificationTable A-1 Switch Specifications C2H124-48P Processors/MemoryMini-GBIC Input/Output Specifications Table A-2 Mini-GBIC Input/Output Port SpecificationsGigabit Ethernet Specifications MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SXMGBIC-LC03 Specifications 1000BASE-LX MGBIC-LC09 Specifications 1000BASE-LX MGBIC-08 Specifications 1000BASE-ELX MGBIC-02 Specifications 1000BASE-TTable A-9 MGBIC-08 Optical Specifications Table A-11 MGBIC-02 SpecificationsConsole Port Pinout Assignments Regulatory ComplianceTable A-12 Compliance Standards Regulatory Compliance Regulatory Compliance Specifications Index Index-2