Chapter 2
Installation
2.1 Introduction
After installing the unit, configure the
If problems are encountered, refer to Chapter 4 for test and diagnostics instructions.
No internal settings, adjustment, maintenance and repairs may be performed by either the operator or the user; such activities may be performed only by
skilled service personnel who are aware of the hazards involved.
Warning Always observe standard safety precautions during installation, operation, and maintenance of this product.
2.2 Site Requirements and Prerequisites
Caution The DC power source must be isolated from the mains supply by double or reinforced insulation.
Allow at least 90 cm (36 in) of frontal clearance for operator access. Allow at least 10 cm (4 in) clearance at the rear of the unit for cable connections. Make sure that the ventilation holes are not blocked.
Site Requirements and Prerequisites |