GBC 930-028 manual Installation

Page 18

Installation

F-60+ Operation and Maintenance Manual

 

 

WARNING

Use extreme caution when operating the machine with the guard off. You can be crushed or burned.

Is the motor functioning?

Test the motor at various speeds ranging from 0-15. At 0 the rolls should stop turning.

Run the motor in both forward and reverse.

Are the heaters working?

Verify that the heater controller heats the top roll.

NOTE

The bottom roll heater controller must be turned on before the top roll heater controller will energize the top heater.

Once you have completed the startup checklist you can safely run a test sample.

2-8

© GBC Pro-Tech 1999 April

Image 18
Contents 0DLQWHQDQFH0DQXDO 60+ Operation and Maintenance Manual 6HFWLRQ Two-Pass Mount and Laminate Hot and Cold Push either Twist pressed Safety DXWLRQin an emergencyDUQLQJ. /DEHO/RFDWLRQV Inside cabinet Decal Meaning Blank 60+ Laminator is properly and securely unpacked Moved and installedThese instructions so that you can insure that your new Is there ample room for the laminator?Installation Alternative Power Configurations Tools required To uncrate the laminatorFork Lift Blade Locations Hex wrench Adjustable wrench Setup ProcedureStartup Checklist To level the laminatorInstallation Operation Power ON/OFF Indicator Indicates Roll Pressure Display Displays the perHE8S Covered under our warranty To your machine and is not recommended orWhen the machine is not in use, the pull rolls Pull roll clutch tension adjustmentMust be raised to prevent damaging the rolls See process chart 3URFHVV &RQWURO&KDUWVFeed the work into the nip with the leading edge tight Lay the print on the board. Using a tack iron, tackHeat-activated laminating using mounting board with Entering the nip evenly from side to side. For thin3URFHGXUH3DVV Identification Diagram 352&66&21752/&+$57352&66&21752/,$*5$0 352&66&21752/&+$57 352&66&21752/,$*5$0One Pass Mounting One Pass Mount and Laminate 352&66&21752/&+$57352&66&21752/,$*5$0 Process One Pass Mount & Laminate DateEncapsulation 352&66&21752/&+$57352&66&21752/,$*5$0 Product 3 Mil Gloss/3Mil GlossCold Overlamination 352&66&21752/&+$57352&66&21752/,$*5$0 Process Cold Overlamination DateCold Mount and Laminate First Pass 352&66&21752/&+$57$352&66&21752/,$*5$0$ Process Cold Mount & Laminate First Pass DateCold Mount and Laminate Second Pass 352&66&21752/&+$57%352&66&21752/,$*5$0% Product Process Cold Mount & Laminate Second PassMount and Hot Overlaminate First Pass 352&66&21752/&+$57$352&66&21752/,$*5$0$ ProductMount and Hot Overlaminate Second Pass 352&66&21752/&+$57%352&66&21752/,$*5$0% Product Process Mount & Hot Overlaminate Second PassOperation GBC Pro-Tech laminators require minimal mainte Clean the rollsAge Inspect the footswitch cord for dam Adjust the nip Adhesive coated boardTo clean beads of adhesive, dust and dirt from the rolls To clean the cabinet and covers$GMXVWLQJWKH1LS Hex wrench ¾ hex wrenchTo adjust the chain tension Hex wrench ScrewdriverXeulfdwlrq 1844 202 440 or fax +44 0 1844 2022XWSXW7URXEOHVKRRWLQJ*XLGH Faces This warranty specifically does not coverUnauthorized customer alterations will void this Warranty Customer’s sole and exclusive remedy under thisWarranty Quantity Part DescriptionSpecifications Pull roll 5clutch adjustment Grease fittings Accessory pack Laminating rolls Adjusting Laminating speedsProcess control charts Resetting the laminator 1-1,3-1Index