GBC 930-028 352&66&21752/&+$57, 352&66&21752/,$*5$0, One Pass Mount and Laminate

Page 29

F-60+ Operation and Maintenance ManualOperation

352&(66&21752/&+$57

Product:_________________________

Process: One Pass Mount & Laminate __ Date:________________

 

 

 

 

 

 

 

FRONT CONTROL SETTINGS

 

 

 

 

 

 

 

Speed: 1-2 fpm (30-60 cpm)

 

Reverse/Forward: Forward

 

 

 

 

 

 

 

Roll Pressure: Trial

 

Top Heater: 240 °F (115 °C)

 

 

 

 

 

 

 

Cooling: Off

 

Bottom Heater: 32 °F (0 °C)

 

 

 

 

 

 

 

 

 

 

 

352&(66&21752/',$*5$0

One Pass Mount and Laminate

NOTE

Footswitch may be used.

Printed

Image

Leader

Board

Falcon

Board

© GBC Pro-Tech 1999 April

3-11

Image 29
Contents 0DLQWHQDQFH0DQXDO 60+ Operation and Maintenance Manual 6HFWLRQ Two-Pass Mount and Laminate Hot and Cold Push either Twist pressed Safety DXWLRQin an emergencyDUQLQJ. /DEHO/RFDWLRQV Inside cabinet Decal Meaning Blank These instructions so that you can insure that your new Moved and installed60+ Laminator is properly and securely unpacked Is there ample room for the laminator?Installation Alternative Power Configurations To uncrate the laminator Tools requiredFork Lift Blade Locations Setup Procedure Hex wrench Adjustable wrenchTo level the laminator Startup ChecklistInstallation Operation Roll Pressure Display Displays the per Power ON/OFF Indicator IndicatesHE8S To your machine and is not recommended or Covered under our warrantyMust be raised to prevent damaging the rolls When the machine is not in use, the pull rollsPull roll clutch tension adjustment 3URFHVV &RQWURO&KDUWV See process chartHeat-activated laminating using mounting board with Lay the print on the board. Using a tack iron, tackFeed the work into the nip with the leading edge tight Entering the nip evenly from side to side. For thin3URFHGXUH3DVV 352&66&21752/,$*5$0 Identification Diagram352&66&21752/&+$57 One Pass Mounting 352&66&21752/&+$57352&66&21752/,$*5$0 352&66&21752/,$*5$0 352&66&21752/&+$57One Pass Mount and Laminate Process One Pass Mount & Laminate Date352&66&21752/,$*5$0 352&66&21752/&+$57Encapsulation Product 3 Mil Gloss/3Mil Gloss352&66&21752/,$*5$0 352&66&21752/&+$57Cold Overlamination Process Cold Overlamination Date352&66&21752/,$*5$0$ 352&66&21752/&+$57$Cold Mount and Laminate First Pass Process Cold Mount & Laminate First Pass Date352&66&21752/,$*5$0% 352&66&21752/&+$57%Cold Mount and Laminate Second Pass Product Process Cold Mount & Laminate Second Pass352&66&21752/,$*5$0$ 352&66&21752/&+$57$Mount and Hot Overlaminate First Pass Product352&66&21752/,$*5$0% 352&66&21752/&+$57%Mount and Hot Overlaminate Second Pass Product Process Mount & Hot Overlaminate Second PassOperation Age Inspect the footswitch cord for dam Adjust the nip Clean the rollsGBC Pro-Tech laminators require minimal mainte Adhesive coated boardTo clean the cabinet and covers To clean beads of adhesive, dust and dirt from the rollsHex wrench ¾ hex wrench $GMXVWLQJWKH1LSHex wrench Screwdriver To adjust the chain tension1844 202 440 or fax +44 0 1844 202 Xeulfdwlrq2XWSXW7URXEOHVKRRWLQJ*XLGH Unauthorized customer alterations will void this Warranty This warranty specifically does not coverFaces Customer’s sole and exclusive remedy under thisWarranty Part Description QuantitySpecifications Process control charts Accessory pack Laminating rolls Adjusting Laminating speedsPull roll 5clutch adjustment Grease fittings Resetting the laminator 1-1,3-1Index