GBC 930-028 manual To level the laminator, Startup Checklist

Page 17

/HYHOLQJ

6WDUWXS

Installation

F-60+ Operation and Maintenance Manual

 

Tools required:

Adjustable wrench

Carpenter's level

To level the laminator:

1.Raise each end, remove the castors and install a leveling pad and stud onto each of the foot brackets at the four bottom corners of the laminator. Thread third nut on stud below cabinet.

2.Thread stud into 4 leveling pads and lock down with nut. Thread second nut onto stud.

3.Place a carpenter's level front to rear across the two lower tie bars at one end of the machine.

4.Level this end of the machine front to rear, raising or lowering the leveling pads by adjusting the mid- dle nuts on the foot bolts.

5.Move the level to the other end of the machine and level front to rear.

6.Place the level directly on one of the tie bars and level the machine side to side.

7.Recheck the front to rear level condition to insure that it has not changed. If it has, repeat the leveling procedure.

8.When all the measurements indicate that the machine is level, tighten down the top nuts on the foot brackets to lock the pads in their current posi- tion.

The first time the laminator is started and every time it is serviced you should use the following checklist to confirm that the unit is operating properly and that all safety mechanisms are functioning.

Startup Checklist

Start the laminator and go through the following check- list.

Are the emergency stop buttons working?

Push down on one of the emergency stop buttons. The laminator should stop. Rotate and pull up on the button and push the reset button on the lower back of the laminator. The laminator should resume operation. Always check all buttons.

WARNING

Never operate the laminator unless all of the emergency stop buttons are functioning properly. You can be crushed or burned.

Are the guard table switches working?

With the laminator running, pull the front guard towards you. The rolls should stop. Move the guard back in. Press the RUN button on the front control panel. The laminator should resume operation.

WARNING

Never operate the laminator unless the

mechanical guard system is operating properly.

You can be crushed or burned.

Is the footswitch working?

Press the footswitch. The laminator should start operation. Vary the speed using the footswitch (like an automobile accelerator) to ensure that the foot- switch is operating properly at various speeds.

© GBC Pro-Tech 1999 April

2-7

Image 17
Contents 0DLQWHQDQFH0DQXDO 60+ Operation and Maintenance Manual 6HFWLRQ Two-Pass Mount and Laminate Hot and Cold Push either Twist pressed Safety DXWLRQin an emergencyDUQLQJ. /DEHO/RFDWLRQV Inside cabinet Decal Meaning Blank These instructions so that you can insure that your new Moved and installed60+ Laminator is properly and securely unpacked Is there ample room for the laminator?Installation Alternative Power Configurations To uncrate the laminator Tools requiredFork Lift Blade Locations Setup Procedure Hex wrench Adjustable wrenchTo level the laminator Startup ChecklistInstallation Operation Roll Pressure Display Displays the per Power ON/OFF Indicator IndicatesHE8S To your machine and is not recommended or Covered under our warrantyMust be raised to prevent damaging the rolls When the machine is not in use, the pull rollsPull roll clutch tension adjustment 3URFHVV &RQWURO&KDUWV See process chartHeat-activated laminating using mounting board with Lay the print on the board. Using a tack iron, tackFeed the work into the nip with the leading edge tight Entering the nip evenly from side to side. For thin3URFHGXUH3DVV 352&66&21752/,$*5$0 Identification Diagram352&66&21752/&+$57 One Pass Mounting 352&66&21752/&+$57352&66&21752/,$*5$0 352&66&21752/,$*5$0 352&66&21752/&+$57One Pass Mount and Laminate Process One Pass Mount & Laminate Date352&66&21752/,$*5$0 352&66&21752/&+$57Encapsulation Product 3 Mil Gloss/3Mil Gloss352&66&21752/,$*5$0 352&66&21752/&+$57Cold Overlamination Process Cold Overlamination Date352&66&21752/,$*5$0$ 352&66&21752/&+$57$Cold Mount and Laminate First Pass Process Cold Mount & Laminate First Pass Date352&66&21752/,$*5$0% 352&66&21752/&+$57%Cold Mount and Laminate Second Pass Product Process Cold Mount & Laminate Second Pass352&66&21752/,$*5$0$ 352&66&21752/&+$57$Mount and Hot Overlaminate First Pass Product352&66&21752/,$*5$0% 352&66&21752/&+$57%Mount and Hot Overlaminate Second Pass Product Process Mount & Hot Overlaminate Second PassOperation Age Inspect the footswitch cord for dam Adjust the nip Clean the rollsGBC Pro-Tech laminators require minimal mainte Adhesive coated boardTo clean the cabinet and covers To clean beads of adhesive, dust and dirt from the rollsHex wrench ¾ hex wrench $GMXVWLQJWKH1LSHex wrench Screwdriver To adjust the chain tension1844 202 440 or fax +44 0 1844 202 Xeulfdwlrq2XWSXW7URXEOHVKRRWLQJ*XLGH Unauthorized customer alterations will void this Warranty This warranty specifically does not coverFaces Customer’s sole and exclusive remedy under thisWarranty Part Description QuantitySpecifications Process control charts Accessory pack Laminating rolls Adjusting Laminating speedsPull roll 5clutch adjustment Grease fittings Resetting the laminator 1-1,3-1Index