GBC 930-028 manual Index

Page 48

7

F-60+ Operation and Maintenance Manual

Index

Technical support

 

Call 1-800-236-8843 4-5

 

Two8-pass mount and laminate 3-7

 

Unpacking 2-4

 

Crate 2-4

 

Upper:main roll 1-3

 

Warnings and cautions 1-1

 

Warranty 5-1

 

7-2

© GBC Pro-Tech 1999 April

Image 48
Contents 0DLQWHQDQFH0DQXDO 60+ Operation and Maintenance Manual 6HFWLRQ Two-Pass Mount and Laminate Hot and Cold Push either Twist pressed Safety DXWLRQin an emergencyDUQLQJ. /DEHO/RFDWLRQV Inside cabinet Decal Meaning Blank Moved and installed These instructions so that you can insure that your new60+ Laminator is properly and securely unpacked Is there ample room for the laminator?Installation Alternative Power Configurations Tools required To uncrate the laminatorFork Lift Blade Locations Hex wrench Adjustable wrench Setup ProcedureStartup Checklist To level the laminatorInstallation Operation Power ON/OFF Indicator Indicates Roll Pressure Display Displays the perHE8S Covered under our warranty To your machine and is not recommended orWhen the machine is not in use, the pull rolls Pull roll clutch tension adjustmentMust be raised to prevent damaging the rolls See process chart 3URFHVV &RQWURO&KDUWVLay the print on the board. Using a tack iron, tack Heat-activated laminating using mounting board withFeed the work into the nip with the leading edge tight Entering the nip evenly from side to side. For thin3URFHGXUH3DVV Identification Diagram 352&66&21752/&+$57352&66&21752/,$*5$0 352&66&21752/&+$57 352&66&21752/,$*5$0One Pass Mounting 352&66&21752/&+$57 352&66&21752/,$*5$0One Pass Mount and Laminate Process One Pass Mount & Laminate Date352&66&21752/&+$57 352&66&21752/,$*5$0Encapsulation Product 3 Mil Gloss/3Mil Gloss352&66&21752/&+$57 352&66&21752/,$*5$0Cold Overlamination Process Cold Overlamination Date352&66&21752/&+$57$ 352&66&21752/,$*5$0$Cold Mount and Laminate First Pass Process Cold Mount & Laminate First Pass Date352&66&21752/&+$57% 352&66&21752/,$*5$0%Cold Mount and Laminate Second Pass Product Process Cold Mount & Laminate Second Pass352&66&21752/&+$57$ 352&66&21752/,$*5$0$Mount and Hot Overlaminate First Pass Product352&66&21752/&+$57% 352&66&21752/,$*5$0%Mount and Hot Overlaminate Second Pass Product Process Mount & Hot Overlaminate Second PassOperation Clean the rolls Age Inspect the footswitch cord for dam Adjust the nipGBC Pro-Tech laminators require minimal mainte Adhesive coated boardTo clean beads of adhesive, dust and dirt from the rolls To clean the cabinet and covers$GMXVWLQJWKH1LS Hex wrench ¾ hex wrenchTo adjust the chain tension Hex wrench ScrewdriverXeulfdwlrq 1844 202 440 or fax +44 0 1844 2022XWSXW7URXEOHVKRRWLQJ*XLGH This warranty specifically does not cover Unauthorized customer alterations will void this WarrantyFaces Customer’s sole and exclusive remedy under thisWarranty Quantity Part DescriptionSpecifications Accessory pack Laminating rolls Adjusting Laminating speeds Process control chartsPull roll 5clutch adjustment Grease fittings Resetting the laminator 1-1,3-1Index