GBC 930-028 manual Lay the print on the board. Using a tack iron, tack

Page 25

3URFHGXUH

(QFDSVXODWLRQ

Operation

-60+ Operation and Maintenance Manual

 

 

1.

Lay the print on the board. Using a tack iron, tack

6HWXS

 

 

 

the leading edge of the print down onto the board

 

 

 

so it is held in place.

1. See process chart 3-3.

 

 

2.

Put a piece of contact/release paper over the print

2.

Laminating Roll Pressure: 30-40%.

 

 

 

and board. Otherwise, adhesive will be applied to

.

Speed: 0-6 fpm (0-180 cpm).

 

 

 

the laminating roll, which can cause damage and

 

 

 

4. Upper Laminator Roll Heat: 230 °F (110 °C).

 

the ink from electrostatic prints will be deposited

 

on the roll.

5. Lower Laminator Roll Heat: 32 °F (0 °C).

 

3.0RXQWLQJFeed the print/board￿/DPLQDWLQJpackage through the nip.

6.

Cooling: Optional.

 

 

 

 

. Use of the rear wind-up roll for the finished mate-

The following procedure is for one-step mounting and

3URFHGXUHrial is optional. It is a good procedure for long runs.

 

 

 

 

heat-activated laminating using mounting board with

 

 

 

 

one6HWXSadhesive side.

Feed the work into the nip with the leading edge tight

3URFHGXUH

and entering the nip evenly from side to side. For thin

 

 

1.

See process chart 3-2.

paper from electrostatic printers in roll form it is best to

fold over the leading edge approximately 6 inches to

2.

Mount the film and web as shown in diagram

createDQG&ROG7ZR￿a3DVV0RXQWsquare￿leading edgeDQG/DPLQDWH.

￿+RW

 

3-2.

 

 

 

 

.

Set the nip for the substrate thickness by raising or

 

 

 

 

 

lowering the upper main roll using the hand crank.

There are several approaches to the mount/laminate

4.

Laminator Roll Pressure: 10–30%.

task. It can be accomplished with either hot or cold

5.

Speed: fpm (1 m/min).

laminate film on the top. Also, the second pass for

6.

Upper Laminator Roll Heat: 240 °F (115 °C).

mounting can be done by feeding from either the front

or6HWXSback of the laminator.

 

 

 

 

 

 

1.

Lay the print on the board. Using a tack iron, tack

See process charts -4, 3-5A & B, and 3-6A & B for

 

the leading edge of the print down onto the board

 

film3URFHGXUHmounting￿instructions￿and machine adjustments.

 

so it is held in place.

2.

Feed the print/board package through the nip.

 

3DVV

 

 

1. Run the print through to apply adhesive and lami- nate.

2. Trim to slightly larger than the desired finished size.

© GBC Pro-Tech 1999 April

3-7

Image 25
Contents 0DLQWHQDQFH0DQXDO 60+ Operation and Maintenance Manual 6HFWLRQ Two-Pass Mount and Laminate Hot and Cold Push either Twist pressed Safety DXWLRQin an emergencyDUQLQJ. /DEHO/RFDWLRQV Inside cabinet Decal Meaning Blank These instructions so that you can insure that your new Moved and installed60+ Laminator is properly and securely unpacked Is there ample room for the laminator?Installation Alternative Power Configurations To uncrate the laminator Tools requiredFork Lift Blade Locations Setup Procedure Hex wrench Adjustable wrenchTo level the laminator Startup ChecklistInstallation Operation Roll Pressure Display Displays the per Power ON/OFF Indicator IndicatesHE8S To your machine and is not recommended or Covered under our warrantyPull roll clutch tension adjustment When the machine is not in use, the pull rollsMust be raised to prevent damaging the rolls 3URFHVV &RQWURO&KDUWV See process chartHeat-activated laminating using mounting board with Lay the print on the board. Using a tack iron, tackFeed the work into the nip with the leading edge tight Entering the nip evenly from side to side. For thin3URFHGXUH3DVV 352&66&21752/&+$57 Identification Diagram352&66&21752/,$*5$0 352&66&21752/,$*5$0 352&66&21752/&+$57One Pass Mounting 352&66&21752/,$*5$0 352&66&21752/&+$57One Pass Mount and Laminate Process One Pass Mount & Laminate Date352&66&21752/,$*5$0 352&66&21752/&+$57Encapsulation Product 3 Mil Gloss/3Mil Gloss352&66&21752/,$*5$0 352&66&21752/&+$57Cold Overlamination Process Cold Overlamination Date352&66&21752/,$*5$0$ 352&66&21752/&+$57$Cold Mount and Laminate First Pass Process Cold Mount & Laminate First Pass Date352&66&21752/,$*5$0% 352&66&21752/&+$57%Cold Mount and Laminate Second Pass Product Process Cold Mount & Laminate Second Pass352&66&21752/,$*5$0$ 352&66&21752/&+$57$Mount and Hot Overlaminate First Pass Product352&66&21752/,$*5$0% 352&66&21752/&+$57%Mount and Hot Overlaminate Second Pass Product Process Mount & Hot Overlaminate Second PassOperation Age Inspect the footswitch cord for dam Adjust the nip Clean the rollsGBC Pro-Tech laminators require minimal mainte Adhesive coated boardTo clean the cabinet and covers To clean beads of adhesive, dust and dirt from the rollsHex wrench ¾ hex wrench $GMXVWLQJWKH1LSHex wrench Screwdriver To adjust the chain tension1844 202 440 or fax +44 0 1844 202 Xeulfdwlrq2XWSXW7URXEOHVKRRWLQJ*XLGH Unauthorized customer alterations will void this Warranty This warranty specifically does not coverFaces Customer’s sole and exclusive remedy under thisWarranty Part Description QuantitySpecifications Process control charts Accessory pack Laminating rolls Adjusting Laminating speedsPull roll 5clutch adjustment Grease fittings Resetting the laminator 1-1,3-1Index