GBC 930-028 manual 352&66&21752/&+$57%, 352&66&21752/,$*5$0%

Page 35

F-60+ Operation and Maintenance Manual

Operation

 

 

352&(66&21752/&+$57%

Product:___________________

Process: Mount & Hot Overlaminate (Second Pass)

Date:________________

 

 

 

 

 

 

 

 

FRONT CONTROL SETTINGS

 

 

 

 

 

 

 

 

 

Speed : 0-6 fpm (0-180 cpm)

 

Reverse/Forward: Forward

 

 

 

 

 

 

 

 

 

Roll Pressure: Trial

 

Top Heater: 32-105 °F (0-40

°C)

 

 

 

 

 

 

 

 

Cooling: Off

 

Bottom Heater: 32 °F (0 °C)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

352&(66&21752/',$*5$0%

Mount and Hot Overlaminate (Second Pass)

NOTE

Use footswitch to load, then accelerate materials through rolls.

Hold

Encapsulated

Image

 

 

 

Release Liner

 

 

(Peel prior to nip)

OPTIONAL

 

 

 

 

 

 

 

 

 

Board

can be

fed

Foam

through

the

pull

Core

 

 

 

rolls using reverse mode.

© GBC Pro-Tech 1999 April

3-17

Image 35
Contents 0DLQWHQDQFH0DQXDO 60+ Operation and Maintenance Manual 6HFWLRQ Two-Pass Mount and Laminate Hot and Cold Push either Twist pressed Safety DXWLRQin an emergencyDUQLQJ. /DEHO/RFDWLRQV Inside cabinet Decal Meaning Blank Is there ample room for the laminator? Moved and installedThese instructions so that you can insure that your new 60+ Laminator is properly and securely unpackedInstallation Alternative Power Configurations To uncrate the laminator Tools requiredFork Lift Blade Locations Setup Procedure Hex wrench Adjustable wrenchTo level the laminator Startup ChecklistInstallation Operation Roll Pressure Display Displays the per Power ON/OFF Indicator IndicatesHE8S To your machine and is not recommended or Covered under our warrantyMust be raised to prevent damaging the rolls When the machine is not in use, the pull rollsPull roll clutch tension adjustment 3URFHVV &RQWURO&KDUWV See process chartEntering the nip evenly from side to side. For thin Lay the print on the board. Using a tack iron, tackHeat-activated laminating using mounting board with Feed the work into the nip with the leading edge tight3URFHGXUH3DVV 352&66&21752/,$*5$0 Identification Diagram352&66&21752/&+$57 One Pass Mounting 352&66&21752/&+$57352&66&21752/,$*5$0 Process One Pass Mount & Laminate Date 352&66&21752/&+$57352&66&21752/,$*5$0 One Pass Mount and LaminateProduct 3 Mil Gloss/3Mil Gloss 352&66&21752/&+$57352&66&21752/,$*5$0 EncapsulationProcess Cold Overlamination Date 352&66&21752/&+$57352&66&21752/,$*5$0 Cold Overlamination Process Cold Mount & Laminate First Pass Date 352&66&21752/&+$57$ 352&66&21752/,$*5$0$ Cold Mount and Laminate First PassProduct Process Cold Mount & Laminate Second Pass 352&66&21752/&+$57%352&66&21752/,$*5$0% Cold Mount and Laminate Second PassProduct 352&66&21752/&+$57$352&66&21752/,$*5$0$ Mount and Hot Overlaminate First PassProduct Process Mount & Hot Overlaminate Second Pass 352&66&21752/&+$57%352&66&21752/,$*5$0% Mount and Hot Overlaminate Second PassOperation Adhesive coated board Clean the rollsAge Inspect the footswitch cord for dam Adjust the nip GBC Pro-Tech laminators require minimal mainteTo clean the cabinet and covers To clean beads of adhesive, dust and dirt from the rollsHex wrench ¾ hex wrench $GMXVWLQJWKH1LSHex wrench Screwdriver To adjust the chain tension1844 202 440 or fax +44 0 1844 202 Xeulfdwlrq2XWSXW7URXEOHVKRRWLQJ*XLGH Customer’s sole and exclusive remedy under this This warranty specifically does not coverUnauthorized customer alterations will void this Warranty FacesWarranty Part Description QuantitySpecifications Resetting the laminator 1-1,3-1 Accessory pack Laminating rolls Adjusting Laminating speedsProcess control charts Pull roll 5clutch adjustment Grease fittingsIndex