Cisco Systems SFS 3001 quick start Install Expansion Modules Optional, Cable the Switch

Page 13

5

If the brackets do not slide easily, the alignment may be off. Pull the switch back toward you and realign the brackets.

Figure 1-5:Sliding the Switch Into the Rack

8.Secure the switch with your screws through the front of the rack, as show in Figure 1-6.

Figure 1-6:Secure Switch with Screws through the Front of the Rack

Install Expansion Modules (Optional)

1.Install any optional Fibre Channel or Ethernet Gateway modules.

2.Install all hardware components before the Topspin 90 is powered on.

3.A gateway module or blanking panel must always be installed.

Cable the Switch

Connect Management Ports

1.Connect one end of the RJ-45 console cable to the InfiniBand chassis serial console port.

2.Connect the other end of the serial cable to your terminal server or management workstation.

3.Connect an Ethernet cable to the Ethernet port (bottom port).

4.Check the LEDs on the Management ports. The link status should be lit.

Image 13
Contents Part Number OL-7712-01 Product ID Page Contents Regulatory Notices Page Electrical Cautions FCC Statement Safety InformationPage Laser Cautions General CautionsLaser Specs Contact InformationPrepare the Site Topspin 90 Quick Start Prepare for the Installation Install the Topspin 90 in an Equipment Rack Rack Mount Installation RequirementsSeparate Brackets 3Holding Rack Bracket Against Inside of Rack Cable the Switch Install Expansion Modules OptionalConnect Management Ports Configure Basic Connectivity Topspin-90config#interface mgmt-ethernet Enter the interface mgmt-ethernet commandTopspin-90#copy running-config startup-config Assigning an Address Dynamically DhcpTopspin-90#show interface mgmt-ethernet Connect and Configure InfiniBand Hosts# mount /mnt/cdrom # cdmount ./tsinstall 7Fully Installed IB Cable with Pinch Connector Install the Element Manager GUITopspinEM Launch Chassis ManagerPrograms -Topspin Element Manager -TopspinEM Configure Additional Settings Layer 2 Bridging Procedure Optional Configure the Ethernet GatewayEnter ifconfig eth# subnet# netmask # Use the broadcast-forwarding commandEnter interface ethernet slot/port Enter interface gateway physical slot#Topspin-90#configure terminal Configure the Fibre Channel Gateway OptionalTopspin-90#show fc srp target Description keyword Discover-itl keyword Topspin-90#show fc srp initiatorSRP ITL Topspin-90#show fc srp itlGateway-portmask-policy keyword Page Index