Cisco Systems SFS 3001 quick start Connect and Configure InfiniBand Hosts, # mount /mnt/cdrom

Page 16

8

f.Enter the option dhcp command. The chosen method will be persistent across module reboots.

Topspin-90(config-if-mgmt-ethernet)# option dhcp

g.Enable the management port by entering the no shutdown command.

Topspin-90(config-if-mgmt-ethernet)# no shutdown

h.Save the configuration to preserve it between reboots.

Topspin-90(config-if-mgmt-ethernet)# exit

Topspin-90(config)# exit

Topspin-90#copy running-config startup-config

i.Use the show interface mgmt-ethernetcommand to view your IP address:.

Topspin-90#show interface mgmt-ethernet

===============================================================

Mgmt-Ethernet Information

===============================================================

mac-address : 00:05:ad:00:15:19 auto-negotiate : enabled

admin-status : up ip-addr : 10.3.102.66

mask : 255.255.0.0 gateway-addr : 10.3.0.1

addr-option : static

Topspin-90#

Connect and Configure InfiniBand Hosts

This section describes a brief overview for configuring your InfiniBand hosts. For more detailed instructions, please see the HCA/Host Side Drivers Users Guide for Linux, which is included with your HCA(s).

If you are installing windows drivers, refer to the HCA Users Guide for Windows.

1.Install the HCA(s).

a.Power down the host system following proper grounding procedures.

b.Unpack the HCA card and insert it into an open 64-bit PCI or PCI-X slot. For more information, see the Host Channel Adapter Installation Guide.

2.Power on the host system.

3.Install the HCA driver(s).

An integrated suite of drivers is provided, including IPoIB, SRP, SDP, uDAPL and MPI.

a.Make sure your Linux kernel is supported. Refer to the Topspin Web site for a list of supported versions.

b.Insert the supplied CD-ROM into the CD-ROM drive. The CD-ROM is provided in the package with your HCA.

c.(Optional) Mount the file-system for the CD-ROM drive if your platform does not auto-mount devices.

# mount /mnt/cdrom

Image 16
Contents Part Number OL-7712-01 Product ID Page Contents Regulatory Notices Page FCC Statement Safety Information Electrical CautionsPage General Cautions Laser CautionsContact Information Laser SpecsTopspin 90 Quick Start Prepare the SiteInstall the Topspin 90 in an Equipment Rack Prepare for the InstallationRack Mount Installation RequirementsSeparate Brackets 3Holding Rack Bracket Against Inside of Rack Cable the Switch Install Expansion Modules OptionalConnect Management Ports Configure Basic Connectivity Enter the interface mgmt-ethernet command Topspin-90config#interface mgmt-ethernetTopspin-90#copy running-config startup-config Assigning an Address Dynamically DhcpTopspin-90#show interface mgmt-ethernet Connect and Configure InfiniBand Hosts# mount /mnt/cdrom # cdmount ./tsinstall Install the Element Manager GUI 7Fully Installed IB Cable with Pinch ConnectorTopspinEM Launch Chassis ManagerPrograms -Topspin Element Manager -TopspinEM Configure Additional Settings Optional Configure the Ethernet Gateway Layer 2 Bridging ProcedureUse the broadcast-forwarding command Enter ifconfig eth# subnet# netmask #Enter interface ethernet slot/port Enter interface gateway physical slot#Topspin-90#configure terminal Configure the Fibre Channel Gateway OptionalTopspin-90#show fc srp target Description keyword Topspin-90#show fc srp initiator Discover-itl keywordTopspin-90#show fc srp itl SRP ITLGateway-portmask-policy keyword Page Index