Cisco Systems SFS 3001 quick start

Page 6

vi

Ensure the ground connection on the power supply is correct and functioning before applying power to the Topspin system.

CAUTION: Always ground yourself before touching any internal Topspin system components to avoid damage from electrostatic discharge (ESD).

CAUTION: The Topspin system has two power cables. The operator must disconnect all power cables before attempting to remove the system from the rack.

CAUTION: Remove power cables by grasping the cable connector and pulling straight out.If the chassis comes equipped with a power-plug retainer, move the bail wire used to retain the plug to the side before attempting to remove the power plug. Replace power-supply cables be grasping the cable connector, align the connector with the power jack, and insert the connector straight into the jack.If the chassis comes equipped with a power-plug retainer, move the bail wire back into place to keep the power plug firmly in place.

CAUTION: The Topspin system contains lithium batteries. Do not attempt to replace or discard these batteries. The batteries may only be serviced by Topspin service personnel.

CAUTION: Observe and follow service markings. Do not service the Topspin system, except as explained in the Topspin documentation supplied with your system. Opening the chassis or removing the enclosure cover exposes you to electrical shock and may damage system components.

If one or more of the following situations occurs, remove power to the Topspin system chassis, and contact your Topspin support representative:

The power cable or power plug is damaged.

The system has been exposed to water.

The system has been dropped or damaged in any way.

The system does not operate correctly after following the installation instructions.

CAUTION: You must ensure the operating environment has adequate air circulation. Keep the Topspin in a cool, well-ventilated room. Do not block cooling vents. Install filler panels into all unused slots.

CAUTION: Use only Topspin-approved gateway expansion modules, controller cards, fans, and power supply modules.

Image 6
Contents Part Number OL-7712-01 Product ID Page Contents Regulatory Notices Page FCC Statement Safety Information Electrical CautionsPage General Cautions Laser CautionsContact Information Laser SpecsTopspin 90 Quick Start Prepare the SiteRack Mount Installation Install the Topspin 90 in an Equipment RackPrepare for the Installation RequirementsSeparate Brackets 3Holding Rack Bracket Against Inside of Rack Install Expansion Modules Optional Cable the SwitchConnect Management Ports Configure Basic Connectivity Topspin-90#copy running-config startup-config Enter the interface mgmt-ethernet commandTopspin-90config#interface mgmt-ethernet Assigning an Address Dynamically DhcpConnect and Configure InfiniBand Hosts Topspin-90#show interface mgmt-ethernet# mount /mnt/cdrom # cdmount ./tsinstall Install the Element Manager GUI 7Fully Installed IB Cable with Pinch ConnectorLaunch Chassis Manager TopspinEMPrograms -Topspin Element Manager -TopspinEM Configure Additional Settings Optional Configure the Ethernet Gateway Layer 2 Bridging ProcedureEnter interface ethernet slot/port Use the broadcast-forwarding commandEnter ifconfig eth# subnet# netmask # Enter interface gateway physical slot#Configure the Fibre Channel Gateway Optional Topspin-90#configure terminalTopspin-90#show fc srp target Description keyword Topspin-90#show fc srp initiator Discover-itl keywordTopspin-90#show fc srp itl SRP ITLGateway-portmask-policy keyword Page Index