Cisco Systems SFS 3001 quick start Gateway-portmask-policy keyword

Page 27

19

NOTE: The fc-lunid field displays the LUN ID of the ITL that you will configure. For non-sequential LUNs, this value will always appear as 00:00:00:00:00:00:00:00. For sequential LUNs, the value will iterate by 1 for each LUN in the target device.

11.Enter the no fc srp itl command with

the GUID of the host

the GUID extension of the host

the WWPN of the target (from step 10)

the LUN ID of the storage disk (from step 10)

the lun-policykeyword

the restricted keyword

to configure the ITL through LUN masking.

Example

Topspin-90(config)#no fc srp itl 00:05:ad:00:00:01:29:c5 00:00:00:00:00:00:00:00 21:00:00:04:cf:f6:c2:ab 00:00:00:00:00:00:00:00 lun-policy restricted

12.Enter the no fc srp it command with

the GUID of the host

the GUID extension of the host

the WWPN of the target

the gateway-portmask-policy keyword

the restricted keyword

the all keyword or the ports you want to unmask

to grant the initiator portmask-policy access to the target.

Example

Topspin-90(config)#no fc srp it 00:05:ad:00:00:01:29:c5 00:00:00:00:00:00:00:00 21:00:00:04:cf:f6:c2:ab gateway-portmask-policy restricted all

13.Enter the no fc srp itl command with

the GUID of the host

the GUID extension of the host

the WWPN of the target

the LUN ID of the storage disk

the gateway-portmask-policy keyword

the restricted keyword

the all keyword or the ports you want to unmask

to grant the initiator portmask-policy access to the LUN.

Example

Topspin-90(config)#no fc srp itl 00:05:ad:00:00:01:29:c5 00:00:00:00:00:00:00:00: 21:00:00:04:cf:f6:c2:ab 00:00:00:00:00:00:00:00 gateway-portmask-policy restricted all

14. Enter the /etc/init.d/ts_srp start command at the host.

Image 27
Contents Part Number OL-7712-01 Product ID Page Contents Regulatory Notices Page Electrical Cautions FCC Statement Safety InformationPage Laser Cautions General CautionsLaser Specs Contact InformationPrepare the Site Topspin 90 Quick StartRequirements Install the Topspin 90 in an Equipment RackPrepare for the Installation Rack Mount InstallationSeparate Brackets 3Holding Rack Bracket Against Inside of Rack Install Expansion Modules Optional Cable the SwitchConnect Management Ports Configure Basic Connectivity Assigning an Address Dynamically Dhcp Enter the interface mgmt-ethernet commandTopspin-90config#interface mgmt-ethernet Topspin-90#copy running-config startup-configConnect and Configure InfiniBand Hosts Topspin-90#show interface mgmt-ethernet# mount /mnt/cdrom # cdmount ./tsinstall 7Fully Installed IB Cable with Pinch Connector Install the Element Manager GUILaunch Chassis Manager TopspinEMPrograms -Topspin Element Manager -TopspinEM Configure Additional Settings Layer 2 Bridging Procedure Optional Configure the Ethernet GatewayEnter interface gateway physical slot# Use the broadcast-forwarding commandEnter ifconfig eth# subnet# netmask # Enter interface ethernet slot/portConfigure the Fibre Channel Gateway Optional Topspin-90#configure terminalTopspin-90#show fc srp target Description keyword Discover-itl keyword Topspin-90#show fc srp initiatorSRP ITL Topspin-90#show fc srp itlGateway-portmask-policy keyword Page Index