Cisco Systems SFS 3001 quick start Topspin-90#show fc srp itl, Srp Itl

Page 26

18

NOTE: This command may take some time to execute.

Example

Topspin-90(config)#fc srp initiator 00:05:ad:00:00:01:29:c5 00:00:00:00:00:00:00:00 discover-itl

10.Enter the show fc srp itl command to display the potential ITLs and record the target-wwpn and fc-lunid values.

Example

Topspin-90(config)# exit

Topspin-90#show fc srp itl

================================================================================

SRP ITL

================================================================================

guid: 00:05:ad:00:00:01:29:c5 extension: 00:00:00:00:00:00:00:00 target-wwpn: 21:00:00:04:cf:f6:c2:ab fc-lunid: 00:00:00:00:00:00:00:00 srp-lunid: 00:00:00:00:00:00:00:00

logical-id (raw 64 bytes): 01:03:00:08:20:00:00:04:cf:f6:c2:ab:00:00:00:00

:

00:00:00:00:00:00:00:00:00:00:00:00:00:00:00:00

:

00:00:00:00:00:00:00:00:00:00:00:00:00:00:00:00

:

00:00:00:00:00:00:00:00:00:00:00:00:00:00:00:00 logical-id (formatted display): 2000000000000000

description: itl device-category: random

lun-policy: restricted

non-restricted-ports: none active-ports: none

physical-access: 6/1 hi-mark: 16

max-retry: 5 min-io-timeout: 10

dynamic-path-affinity: false dynamic-gateway-port-loadbalancing: true dynamic-storage-port-loadbalancing:

dynamic-gateway-port-failover: false dynamic-storage-port-failover:

active-slots: none

Total: 1 itls.

Topspin-90#

Image 26
Contents Part Number OL-7712-01 Product ID Page Contents Regulatory Notices Page FCC Statement Safety Information Electrical CautionsPage General Cautions Laser CautionsContact Information Laser SpecsTopspin 90 Quick Start Prepare the SiteRack Mount Installation Install the Topspin 90 in an Equipment RackPrepare for the Installation RequirementsSeparate Brackets 3Holding Rack Bracket Against Inside of Rack Connect Management Ports Install Expansion Modules OptionalCable the Switch Configure Basic Connectivity Topspin-90#copy running-config startup-config Enter the interface mgmt-ethernet commandTopspin-90config#interface mgmt-ethernet Assigning an Address Dynamically Dhcp# mount /mnt/cdrom Connect and Configure InfiniBand HostsTopspin-90#show interface mgmt-ethernet # cdmount ./tsinstall Install the Element Manager GUI 7Fully Installed IB Cable with Pinch ConnectorPrograms -Topspin Element Manager -TopspinEM Launch Chassis ManagerTopspinEM Configure Additional Settings Optional Configure the Ethernet Gateway Layer 2 Bridging ProcedureEnter interface ethernet slot/port Use the broadcast-forwarding commandEnter ifconfig eth# subnet# netmask # Enter interface gateway physical slot#Topspin-90#show fc srp target Configure the Fibre Channel Gateway OptionalTopspin-90#configure terminal Description keyword Topspin-90#show fc srp initiator Discover-itl keywordTopspin-90#show fc srp itl SRP ITLGateway-portmask-policy keyword Page Index