Cisco Systems SFS 3001 quick start Topspin 90 Quick Start, Prepare the Site

Page 9

1

1

Topspin 90 Quick Start

This document describes the basic steps required to install and configure the Topspin 90 system.

For more detailed information about the Topspin 90 server switch, we recommend that you have the

Topspin 90 Hardware Guide available.

“Prepare the Site” on page 1

“Install the Topspin 90 in an Equipment Rack” on page 2

“Install Expansion Modules (Optional)” on page 5

“Cable the Switch” on page 5

“Configure Basic Connectivity” on page 6

“Connect and Configure InfiniBand Hosts” on page 8

“Install the Element Manager (GUI)” on page 10

“Launch Chassis Manager” on page 11

“Configure Additional Settings” on page 12

“(Optional) Configure the Ethernet Gateway” on page 13

“Configure the Fibre Channel Gateway (Optional)” on page 15

Prepare the Site

1.Read the cautionary statements in “Safety Information” on page v.

2.Unpack the Topspin 90 package, using the packing list provided.

3.Register the Topspin system online. Go to http://topspin.com/support/.

4.Prepare a management workstation, such as a PC or laptop running a terminal program, and a straight-through M/F DB-9 serial cable (included).

Image 9
Contents Part Number OL-7712-01 Product ID Page Contents Regulatory Notices Page Electrical Cautions FCC Statement Safety InformationPage Laser Cautions General CautionsLaser Specs Contact InformationPrepare the Site Topspin 90 Quick StartPrepare for the Installation Install the Topspin 90 in an Equipment RackRack Mount Installation RequirementsSeparate Brackets 3Holding Rack Bracket Against Inside of Rack Install Expansion Modules Optional Cable the SwitchConnect Management Ports Configure Basic Connectivity Topspin-90config#interface mgmt-ethernet Enter the interface mgmt-ethernet commandTopspin-90#copy running-config startup-config Assigning an Address Dynamically DhcpConnect and Configure InfiniBand Hosts Topspin-90#show interface mgmt-ethernet# mount /mnt/cdrom # cdmount ./tsinstall 7Fully Installed IB Cable with Pinch Connector Install the Element Manager GUILaunch Chassis Manager TopspinEMPrograms -Topspin Element Manager -TopspinEM Configure Additional Settings Layer 2 Bridging Procedure Optional Configure the Ethernet GatewayEnter ifconfig eth# subnet# netmask # Use the broadcast-forwarding commandEnter interface ethernet slot/port Enter interface gateway physical slot#Configure the Fibre Channel Gateway Optional Topspin-90#configure terminalTopspin-90#show fc srp target Description keyword Discover-itl keyword Topspin-90#show fc srp initiatorSRP ITL Topspin-90#show fc srp itlGateway-portmask-policy keyword Page Index