Cisco Systems SFS 3001 Use the broadcast-forwarding command, Enter interface ethernet slot/port

Page 22

14

Use the broadcast-forwarding command.

Example

Topspin-90(config)#bridge-group 21 broadcast-forwarding

Topspin-90(config)#

or

If you are not using DHCP, configure the next InfiniBand hop. Use the ib-next-hopcommand.

Example

Topspin-90(config)#bridge-group 1 ib-next-hop

Topspin-90(config)#

4.Specify the Ethernet Gateway to which you want to assign the new bridge-group.

Enter interface ethernet slot/port

Specify the new bridge-group

Example

Topspin-90(config)#interface ethernet 2/1

Topspin-90(config-if-ether-2/1)# bridge-group 21 pkey 00:01

5.Specify the internal interface gateway to which you want to assign the new bridge-group.

The interface gateway number is the same as the physical slot number of the Ethernet gateway that you are configuring (in this example, the number is 2).

Enter interface gateway physical slot#.

Specify the new bridge group.

Example

Topspin-90(config-if-ether-2/1)# interface gateway 2

Topspin-90(config-if-gw-2)# bridge-group 21

Topspin-90(config-if-gw-2)#

6.Return to User-Exec mode and view the bridge-group.

Enter exit.

Enter exit.

Enter show bridge-group:

Example

Topspin-90(config-if-gw-2)# exit

Topspin-90(config)# exit

Topspin-90#show bridge-group

All configured bridging-ports are displayed.

7.Configure the Ethernet hosts by entering ifconfig eth# ip-addressnetmask netmask.

Log in to the host as a root user.

Enter ifconfig eth# subnet# netmask #

Example

#ifconfig eth1 61.0.0.0 netmask 255.255.0.0

Repeat for all Ethernet hosts.

Image 22
Contents Part Number OL-7712-01 Product ID Page Contents Regulatory Notices Page FCC Statement Safety Information Electrical CautionsPage General Cautions Laser CautionsContact Information Laser SpecsTopspin 90 Quick Start Prepare the SiteRack Mount Installation Install the Topspin 90 in an Equipment RackPrepare for the Installation RequirementsSeparate Brackets 3Holding Rack Bracket Against Inside of Rack Cable the Switch Install Expansion Modules OptionalConnect Management Ports Configure Basic Connectivity Topspin-90#copy running-config startup-config Enter the interface mgmt-ethernet commandTopspin-90config#interface mgmt-ethernet Assigning an Address Dynamically DhcpTopspin-90#show interface mgmt-ethernet Connect and Configure InfiniBand Hosts# mount /mnt/cdrom # cdmount ./tsinstall Install the Element Manager GUI 7Fully Installed IB Cable with Pinch ConnectorTopspinEM Launch Chassis ManagerPrograms -Topspin Element Manager -TopspinEM Configure Additional Settings Optional Configure the Ethernet Gateway Layer 2 Bridging ProcedureEnter interface ethernet slot/port Use the broadcast-forwarding commandEnter ifconfig eth# subnet# netmask # Enter interface gateway physical slot#Topspin-90#configure terminal Configure the Fibre Channel Gateway OptionalTopspin-90#show fc srp target Description keyword Topspin-90#show fc srp initiator Discover-itl keywordTopspin-90#show fc srp itl SRP ITLGateway-portmask-policy keyword Page Index