Cisco Systems SFS 3001 quick start General Cautions, Laser Cautions

Page 7

vii

CAUTION: Never place your hand inside an empty card or module bay. You should never have cause to place a hand anywhere inside the Topspin chassis. Unused card and module bays should always have a Topspin cover over the bay to ensure proper safety, ventilation, and cooling.

General Cautions

CAUTION: No user is authorized to remove the Topspin system enclosure cover. The internal chassis contains no user-serviceable components. Removing the enclosure cover voids your warranty. See the warranty card for further details regarding the servicing of your chassis.

CAUTION: Opening and/or modifying expansion and system modules may void your warranty. Refer to your warranty to determine access restrictions.

In general:

Do not spill food or liquids on your system components.

Protect your Topspin system from sudden power-surges and interruptions by using a surge suppressor, line conditioner, or uninterruptable power supply (UPS).

Place cables appropriately so that they do not obstruct any egress within the data center and they do not block any ventilation inlets or outlets.

Rack mount the Topspin chassis according to the rack manufacturer recommendations.

Laser Cautions

CAUTION: Only qualified service technicians should repair laser devices.

CAUTION: Only open, modify, or service laser devices as specified in the manufacturer documentation.

CAUTION: Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous laser radiation exposure.

CAUTION: In order to ensure eye safety, only the fiber-optic transceivers indicated in the following table may be used.

Image 7
Contents Part Number OL-7712-01 Product ID Page Contents Regulatory Notices Page Electrical Cautions FCC Statement Safety InformationPage Laser Cautions General CautionsLaser Specs Contact InformationPrepare the Site Topspin 90 Quick StartRequirements Install the Topspin 90 in an Equipment RackPrepare for the Installation Rack Mount InstallationSeparate Brackets 3Holding Rack Bracket Against Inside of Rack Cable the Switch Install Expansion Modules OptionalConnect Management Ports Configure Basic Connectivity Assigning an Address Dynamically Dhcp Enter the interface mgmt-ethernet commandTopspin-90config#interface mgmt-ethernet Topspin-90#copy running-config startup-configTopspin-90#show interface mgmt-ethernet Connect and Configure InfiniBand Hosts# mount /mnt/cdrom # cdmount ./tsinstall 7Fully Installed IB Cable with Pinch Connector Install the Element Manager GUITopspinEM Launch Chassis ManagerPrograms -Topspin Element Manager -TopspinEM Configure Additional Settings Layer 2 Bridging Procedure Optional Configure the Ethernet GatewayEnter interface gateway physical slot# Use the broadcast-forwarding commandEnter ifconfig eth# subnet# netmask # Enter interface ethernet slot/portTopspin-90#configure terminal Configure the Fibre Channel Gateway OptionalTopspin-90#show fc srp target Description keyword Discover-itl keyword Topspin-90#show fc srp initiatorSRP ITL Topspin-90#show fc srp itlGateway-portmask-policy keyword Page Index