PSC 315 manual Terminal Setup

Page 50

Terminal Setup

a. Emulation protocols (IBM 5250, IBM 3270, DEC VT200, etc.) b. PowerNet Twin Client products

c. RF network concepts

d. Wired network concepts e. Telnet sessions

f. TCP/IP

They are text files that can be read with any editor or viewer and can be useful to end users and integrators, even if they may not have all the requirements above.

I have an intermittent problem and it could happen on any one of my 100 terminals. RF Monitor only does one terminal at a time. What can I do?

RF Monitor is not the right diagnostic tool for this type of problem. PowerNet products have another diagnostic tool that can be used called the "Diagnostic Server".

This tool can be set up to run trace diagnostics on up to 300 terminals at the same time. This tool will be provided as needed for systems under PowerNet support agreement OR by T&M when they are not covered.

It also includes the service of a PowerNet support engineer.

Server Transfer is another feature. From the Tools menu, select Server Transfer.

The FTP Settings screen appears.

To send object editor and configuration files from Windows to your Linux box, enter your server address, and click on OK.

2-42

Supported Equipment Manual May, 2006

Image 50
Contents Supported Equipment Manual Production Copyright 1996 2006 by Connect, IncTrademarks Chapter Error Message Resolution Guide Terminal SetupChapter Keypad Configuration IntroductionThis page is intentionally blank Description PictureBios Setup RequirementsAccessories Version of BiosRelease Notes Patch version a Terminal Setup Downloading from the WEB Running Setup from a Download FileInstallation Installation Running the Manager Menu BarQuick Start Configuring the ManagerSetting the Emulation ToolbarSetting the Servers Setting Terminal Operations Setting Terminal Model Saving the ConfigurationSetting Airloader Auto-Configuration Terminal Setup Downloading Files To Terminal Booting the Terminal Recoverable Error Starting a Telnet SessionVT Settings Standard SetupSetup Using Twin Client Manager Quadrant Mode Settings Quadrant Mode Key Click Quadrant Mode Edit Server/Host IPs Terminal Setup Using Twin Client MenusEdit Mobile Unit IP Run Site Survey Switch Client ModesEdit License Key Run Client EmulatorAuthorizing PowerNet Authorized Terminals Adding Licenses Transferring Licenses Listing Enabling Automatic Downloads Airloader Auto-ConfigurationSoftware Management Automatic IP Address Assignment Synchronizing Configuration FilesSynchronizing Program Files Creating New Groups Terminal Setup Software Management Setting the Default Terminal Group Setting the SegmentSetting Force Reload Reassigning TerminalsMobile Device Manager MDM Features Select Terminal Messenger from the Tools menu Software Management Terminal Setup Software Management Terminal Setup Software Management Terminal Setup Common Problems with RF Monitor Terminal Setup Manual Download of Configuration Files This page is intentionally blank Keypad Configuration Keypad FiguresFN1 FN2 ESC 5250 Keypad Table VtermAlt PA1 This page is intentionally blank Minus not Valid Entry TOO LongAlphabetic only Decimal not ValidMust Clear Field Unrecoverable ErrorInvalid KEY Scan not AllowedReboot Mobile Unit Mobile UnitWaiting to Send Message Reason Solution Reference Tech Note Message Reason Solution Reference Tech Note Message Reason Solution Reference Tech Note Message Reason Solution Reference Tech Note Remove Serial Cable OUT of Range of BaseConnect Serial Cable Place in CradleRemove from Cradle Acquiring Cradle BUSMessage Reason Solution Reference Tech Note Name Server Message Reason Solution Reference Tech Note Host Entry Emulation Setup Test Options Miscellaneous SetupLogin Options OFF Message Reason Solution Reference Tech Note Message Reason Solution Reference Tech Note Message Reason Solution Reference Tech Note Message Reason Solution Reference Tech Note Message Reason Solution Reference Tech Note Message Reason Solution Reference Tech Note Setup Null