MGE UPS Systems 2000, 3000 VA user manual Hot swap, Connection of equipment to a terminal block

Page 17

2. Installation

Hot swap

Before carrying out any connections, check that the battery circuit breaker 8 is OFF and that the electrical power cord to the AC-power source is disconnected.

Connection of equipment to outlets

Plug your equipment into the outlets 2 .

 

 

 

 

 

Connection of equipment to a terminal block:

 

 

 

 

 

This type of connection must be carried out by qualified

 

 

 

 

2

electrical personnel.

 

 

 

 

 

 

 

 

 

1.

Remove the terminal-block cover 32 .

 

 

 

 

 

2.

Insert the cable supplying the equipment through the cable

 

 

 

 

 

 

 

 

 

 

clamp 33 .

 

 

 

 

 

3.

Connect the three wires to the output terminal block 5 .

8

32

33

5 Output terminal block

Phase

Neutral

Earthing wire

1

29

Always connect the earthing wire first.

4.Remove the terminal-block cover.

5.Tighten the nut on the cable clamp 33 .

The overall cable diameter and the cross-sectional area of the three wires depends on the UPS rating.

 

Pulsar EXtreme

Pulsar EXtreme

 

2000

3000

 

 

 

Cable diameter

From 9 to 12 mm

From 9 to 12 mm

 

 

 

Cross-sectional area of each wire

1 to 4 mm2

1,5 to 4 mm2

Recommended upstream

 

 

circuit breaker

 

 

Nominal rating

C60N 10A 2P

C60N 16A 2P

(47 to 63Hz, 230V)

(maximum line

(maximum line

 

current = 9A)

current = 13A)

Maximum rating

C60N 16A 2P

C60N 20A 2P

(47 to 63Hz, 187V)

(maximum line

(maximum line

 

current = 11A)

current = 16A)

 

 

 

Connection to the AC-power source:

1.Connect the electrical power cord 29 to the socket 1 for connection to AC-power source.

2.Connect the other end of the electrical power cord

to an AC-power outlet.

51033211EN/AC - Page 17

Image 17
Contents Pulsar EXtreme Introduction Pictograms Using this documentForeword Contents Glossary Index Failure of AC input power and operation on battery powerPulsar EXtreme range PresentationTower model Rack modelHot swap Install Fault tolerantConnection modules Output terminal block with cable clampBack Options Battery extensions for UPS backup times of 66 minutesCLA Control panel Alarms Battery Load RemainingUnpacking and checks InstallationCD ROM with Solution Pac and UPS Driver softwares Rack model Rack mounting diagram with rails Installation of the rack versionConnection to the RS 232 communications port optional Installation of the communications-card optionConnection to the AC-power source Securing and connecting the connection modulesSecuring the connection modules Two screwsConnection of equipment to a terminal block Always connect the earthing wire firstHot swap Power and equipment connections Operation ON-LINE operating modeBargraph indications Start-upFailure of AC input power and operation on battery power Personalization Personalizable function Default settingFunction On / OFF conditions tabPersonalizable function Default setting Options Battery tabOutput tab By-pass tabShutdown Connected equipment is no longer supplied with powerTroubleshooting Maintenance26 51033211EN/AC Connected equipment is again protected by the UPS UPS replacementFault-tolerant connection module Hot-swap and Install connection modules Press button 24 and wait 20 seconds Check that LED 21 is on Environment UPS recycling at the end of service lifeThis product has been designed to respect the environment PackingGlossary AppendicesON-LINE mode InstallSleep mode Start on battery powerIndex Battery34 51033211EN/AC