American Power Conversion
InfraStruXureTM System
manual
Installation and Start-Up
Specs
Install
Connect control wiring
Dimension
Problem Action
Battery Enclosure
Start-Up Procedure
Weight
How to
Safety
Page 1
Installation and
Start-Up
80kW InfraStruXure
TM
System
Medium Data Centers 208/480/600V Input
Page 1
Page 2
Image 1
Page 1
Page 2
Contents
Installation and Start-Up
Page
Page
Page
About this Manual
Page
Contents
Installation Procedures
Appendix a System Operation
Page
Cross-reference symbols used in this manual
Safety symbols used in this manual
Overview
Maintenance performed while the PDU is receiving input power
Installation/Maintenance
Emergency Power Off EPO
Total Power Off
EMI
InfraStruXure PDU
Dimensions
Symmetra PX UPS
NetShelter VX Enclosure
Battery Enclosure
Rack Distribution Panel
Space Considerations
Component Maximum Weight
Weight Considerations
Symmetra PX UPS
Heat Output
Procedures requiring a licensed electrician
Electrical Requirements and Specifications
Electrical requirements
Overview
Cross Tie Output Circuit Breaker
Pduups
Emergency Power Off EPO
Basic Installation Procedure
Licensed electrician must connect utility power
Start the system
Tool Supplied?
Tools Required
InfraStruXure System-Installation and Start-Up
Level the PDU, UPS, RDP, NetShelter and Battery Enclosures
Installation Procedures
Exchange Side Panels
Connect Battery Enclosure communication cables
Attach the PDU, UPS, and Battery Enclosure
How to ensure that all power is off
Ensure that All Power is Off
Installation Procedures Ensure that All Power is Off
Connect Utility Conductors to the PDU
Connect AC Power and Control Wiring
Equipment
Connect control wiring
Jumper wire must be installed in position 13
Connect DC Power Wiring
UPS
Cascade Battery Enclosures
Battery Enclosure Symmetra PX UPS
EPO
Connect an Emergency Power Off Switch
Contact Closure-Normally Open
Problem Action
Safety warnings
ATS 0 ATS 1 ATS ATS EN
Relay output specifications
How to connect contacts to the PDU monitoring unit
InfraStruXure System-Installation and Start-Up
Cable Ladders for overhead wiring across rows
Install the Rack Automatic Transfer Switches ATS
Install InfraStruXure Rack-Mount Devices
Install the Rack Power Distribution Units PDU
Install the InfraStruXure Manager and Hub or Switch
Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
Installation Procedures Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Connect network cables to components
Route Data Cables to the InfraStruXure Manager Hub or Switch
Overhead routing
Page
Ensure that all power is off
Start-Up Procedure
Start-Up Procedure InfraStruXure System
Use two people to lift and install battery units
Apply power to the system
Start-Up Procedure InfraStruXure System
PowerView RM Rev 000 English Please wait
Verify UPS battery operation
UPS load is on Press any key
Verify proper voltage and phase rotation on the PDU
Start the UPS
PowerView RM Rev 000 English Please wait
Close turn on the Q2 circuit breaker on the PDU
Page
Start-Up Procedure InfraStruXure System
Page
Power the PDU Distribution Circuit Breakers
Close Cross-Tie
Configure the InfraStruXure Manager
Page
Appendix a System Operation
How to Transfer the UPS into Maintenance Bypass Operation
Appendix a System Operation
UPS is now in maintenance bypass operation
How to Return from Maintenance Bypass Operation
Confirm Yes, UPS Load on No, Abort
Confirm Yes, UPS into Bypass No, Abort
How to Ensure Total Power Off
Appendix a System Operation
How to Apply Power to the System
Fuel% Load% 208V out000V 60Hz Runtime 1hr 2m
Top-Level Status Screen
Appendix a System Operation
Appendix
Appendix B Single
Appendix B Single-Line Diagrams
Page
Changes by page number
General changes
Page
Index
InfraStruXure System-Installation and Start-Up
UPS
Page
Page
990-1467B
Related pages
All Install page
Installation for Honeywell 2700
Installation for Whirlpool ELECTRONIC GAS DRYER
Preparing the installation for Samsung AP0AS0ANXSG
Uninstalling the DMI Package for HP Book 6000
Battery Cable Installation for Multiquip MQ62TDD
Installing The Battery for JVC GR-DLS1
Zvolte položku Menu Setup Install Rear Floor for Samsung SPL300WX/EN
R i f y i n g S u c c e s s f u l Installation for Paxar 9860
Installation for Xerox 632
Grille Cover Plate Installation for Hearth and Home Technologies SAPPH-D-CSB
How often should I perform
nilfisk huolto
on my pressure washer?
Top
Page
Image
Contents