American Power Conversion InfraStruXureTM System manual Appendix

Page 89

80kW PDU with System Bypass 208V, 480V, or 600V Input, Single-feed, with Transformer

Appendix

InfraStruXure System—Installation and Start-Up

All Wiring

H3

 

 

2/0

4/0 Unless Noted

 

 

 

0W1870

Q3

320A

4P

0W1860

 

 

2A

 

 

Bottom Feed

600V: 0W1782

 

 

 

 

 

 

 

H3

Option

480V: 0W1782

 

 

 

 

0W1871

Bypass

 

 

 

 

208V: 0W1783

 

 

 

 

 

2/0

Q2

320A

 

 

 

 

 

 

 

 

600V

S1

 

 

 

 

Output

 

 

4P

 

 

 

 

 

 

 

 

 

480V 225A/400A 112.5kVA

Q1

 

FL=121A

 

 

2A

 

208V

3P

V

208V

360A 3P

 

 

0W1862

 

 

 

 

Mains

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0W1865

 

 

 

 

S

A

 

T

2A

Input

0W1873

 

2/0

 

 

 

 

Symmetra

 

 

 

500

 

 

600V: 0W1815

 

 

 

 

 

MCM

 

 

 

 

 

 

 

 

 

 

 

 

 

480V: 0W1814

 

 

PX

 

 

 

AC

 

 

 

208V: 0W1810

 

 

 

 

 

 

 

 

 

 

80kW

 

 

 

Mains

 

 

 

 

 

 

 

 

 

 

GND

 

 

 

 

 

 

 

 

 

 

Load Port

Option

This drawing and specifications herein are the property of American Power Conversion

and shall not be reproduced or copied or used in whole or par as the basis for the manufacture or sale of items without written permission from APC.

 

80A

I

 

 

80A

80A

 

I

 

80A

 

I

Sub Feeds

 

80A

 

 

I

 

 

 

 

 

20A

I

 

 

20A

 

V

I

 

 

 

0W1874 I

 

I

 

20A

I

 

 

I

 

 

 

 

20A I

42-Position

400-Amp Rated

Panel

VVoltage Monitoring(RMS) I Current Monitoring

2A Dual Aux Switch

AAux Switch

B : Single-Line Diagrams

SShunt Trip Lamps

79

Image 89
Contents Installation and Start-Up Page Page Page About this Manual Page Contents Installation Procedures Appendix a System Operation Page Overview Safety symbols used in this manualCross-reference symbols used in this manual Maintenance performed while the PDU is receiving input power Installation/MaintenanceEmergency Power Off EPO Total Power OffEMI Symmetra PX UPS DimensionsInfraStruXure PDU NetShelter VX Enclosure Battery EnclosureRack Distribution Panel Space Considerations Component Maximum Weight Weight ConsiderationsSymmetra PX UPS Heat OutputElectrical requirements Electrical Requirements and SpecificationsProcedures requiring a licensed electrician Overview Cross Tie Output Circuit BreakerPduups Emergency Power Off EPOBasic Installation Procedure Licensed electrician must connect utility power Start the system Tool Supplied? Tools RequiredInfraStruXure System-Installation and Start-Up Level the PDU, UPS, RDP, NetShelter and Battery Enclosures Installation ProceduresExchange Side Panels Connect Battery Enclosure communication cables Attach the PDU, UPS, and Battery Enclosure How to ensure that all power is off Ensure that All Power is OffInstallation Procedures Ensure that All Power is Off Connect Utility Conductors to the PDU Connect AC Power and Control Wiring Equipment Connect control wiring Jumper wire must be installed in position 13 Connect DC Power Wiring UPS Cascade Battery EnclosuresBattery Enclosure Symmetra PX UPS EPO Connect an Emergency Power Off SwitchContact Closure-Normally Open Problem Action Safety warnings ATS 0 ATS 1 ATS ATS EN Relay output specifications How to connect contacts to the PDU monitoring unitInfraStruXure System-Installation and Start-Up Cable Ladders for overhead wiring across rows Install the Rack Automatic Transfer Switches ATS Install InfraStruXure Rack-Mount DevicesInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and Attach Overhead Wiring Route and attach power cables to equipment racks Installation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Connect network cables to components Route Data Cables to the InfraStruXure Manager Hub or SwitchOverhead routing Page Ensure that all power is off Start-Up ProcedureStart-Up Procedure InfraStruXure System Use two people to lift and install battery units Apply power to the systemStart-Up Procedure InfraStruXure System PowerView RM Rev 000 English Please wait Verify UPS battery operation UPS load is on Press any key Verify proper voltage and phase rotation on the PDU Start the UPS PowerView RM Rev 000 English Please wait Close turn on the Q2 circuit breaker on the PDU Page Start-Up Procedure InfraStruXure System Page Power the PDU Distribution Circuit Breakers Close Cross-Tie Configure the InfraStruXure Manager Page Appendix a System Operation How to Transfer the UPS into Maintenance Bypass OperationAppendix a System Operation UPS is now in maintenance bypass operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort How to Ensure Total Power Off Appendix a System Operation How to Apply Power to the System Fuel% Load% 208V out000V 60Hz Runtime 1hr 2m Top-Level Status Screen Appendix a System Operation Appendix Appendix B Single Appendix B Single-Line Diagrams Page Changes by page number General changesPage Index InfraStruXure System-Installation and Start-Up UPS Page Page 990-1467B