American Power Conversion InfraStruXureTM System Connect Battery Enclosure communication cables

Page 31

Installation Procedures: Exchange Side Panels

2.Remove the solid side panels from the sides of the UPS that will be adjacent to the PDU and the Battery Enclosure in your planned configuration.

3.Remove the side panels from the sides of the PDU and Battery Enclosure that will not be adjacent to the UPS.

4. Remove the rear hole covers from the panels that you removed in step 3.

Connect Battery Enclosure communication cables:

5.Route the communication cable through the hole between the UPS and the Battery Enclosure. Route the cable from the side of the UPS to which it is attached, around the back of the UPS, and through the hole on the other side of the UPS to the front of the Battery Enclosure.

6.Connect the cable to Port 1 on the first adjacent Battery Enclosure’s XR Communication Card.

7.Connect Port 2 on the first Battery Enclosure to Port 1 on the next Battery Enclosure. Route the cable the same way as described in step 5.

Continue until all XR Communication Cards are connected.

 

XR Battery Enclosure 2

 

Terminator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

XR Communications Card

 

 

 

 

Port 1

Port 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

le

 

XR Battery Enclosure 1

 

 

 

 

C

a

b

 

 

 

m

.

 

 

 

 

m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

o

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

XR Communications Card

 

 

 

 

Port 1

Port 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

le

 

 

 

 

 

 

 

 

Symmetra PX UPS

 

 

 

. C

a

b

 

 

 

 

 

 

 

 

 

m

m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

o

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

XR Communications Card

Port 1

Port 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8.Locate the XR Communication Card terminator

and insert it into the open port of the last Battery Enclosure in your configuration.

The terminator is in Port 1 of the UPS XR Communication Card and in Port 2 of the Battery Enclosure XR Communication Card.

Note

9.Install, on the UPS, the side panels that you removed from the PDU and the Battery Enclosure in step 3 and reattach the ground wires.

10.Install, on the PDU and the Battery Enclosure, the solid side panel that you removed from the UPS in step 2 and reattach the ground wires.

InfraStruXure System—Installation and Start-Up

21

Image 31
Contents Installation and Start-Up Page Page Page About this Manual Page Contents Installation Procedures Appendix a System Operation Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Maintenance performed while the PDU is receiving input power Installation/MaintenanceEmergency Power Off EPO Total Power OffEMI InfraStruXure PDU DimensionsSymmetra PX UPS NetShelter VX Enclosure Battery EnclosureRack Distribution Panel Space Considerations Component Maximum Weight Weight ConsiderationsSymmetra PX UPS Heat OutputProcedures requiring a licensed electrician Electrical Requirements and SpecificationsElectrical requirements Overview Cross Tie Output Circuit BreakerPduups Emergency Power Off EPOBasic Installation Procedure Licensed electrician must connect utility power Start the system Tool Supplied? Tools RequiredInfraStruXure System-Installation and Start-Up Level the PDU, UPS, RDP, NetShelter and Battery Enclosures Installation ProceduresExchange Side Panels Connect Battery Enclosure communication cables Attach the PDU, UPS, and Battery Enclosure How to ensure that all power is off Ensure that All Power is OffInstallation Procedures Ensure that All Power is Off Connect Utility Conductors to the PDU Connect AC Power and Control Wiring Equipment Connect control wiring Jumper wire must be installed in position 13 Connect DC Power Wiring UPS Cascade Battery EnclosuresBattery Enclosure Symmetra PX UPS EPO Connect an Emergency Power Off SwitchContact Closure-Normally Open Problem Action Safety warnings ATS 0 ATS 1 ATS ATS EN Relay output specifications How to connect contacts to the PDU monitoring unitInfraStruXure System-Installation and Start-Up Cable Ladders for overhead wiring across rows Install the InfraStruXure Manager and Hub or Switch Install InfraStruXure Rack-Mount DevicesInstall the Rack Automatic Transfer Switches ATS Install the Rack Power Distribution Units PDURoute and Attach Overhead Wiring Route and attach power cables to equipment racks Installation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Connect network cables to components Route Data Cables to the InfraStruXure Manager Hub or SwitchOverhead routing Page Ensure that all power is off Start-Up ProcedureStart-Up Procedure InfraStruXure System Use two people to lift and install battery units Apply power to the systemStart-Up Procedure InfraStruXure System PowerView RM Rev 000 English Please wait Verify UPS battery operation UPS load is on Press any key Verify proper voltage and phase rotation on the PDU Start the UPS PowerView RM Rev 000 English Please wait Close turn on the Q2 circuit breaker on the PDU Page Start-Up Procedure InfraStruXure System Page Power the PDU Distribution Circuit Breakers Close Cross-Tie Configure the InfraStruXure Manager Page Appendix a System Operation How to Transfer the UPS into Maintenance Bypass OperationAppendix a System Operation UPS is now in maintenance bypass operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort How to Ensure Total Power Off Appendix a System Operation How to Apply Power to the System Fuel% Load% 208V out000V 60Hz Runtime 1hr 2m Top-Level Status Screen Appendix a System Operation Appendix Appendix B Single Appendix B Single-Line Diagrams Page Changes by page number General changesPage Index InfraStruXure System-Installation and Start-Up UPS Page Page 990-1467B