American Power Conversion InfraStruXureTM System manual Appendix B Single-Line Diagrams

Page 91

80kW PDU with System Bypass 208V Input, Single-feed, without a Transformer

InfraStruXure System—Installation and Start-Up

 

 

 

 

All Wiring

 

H3

 

 

2/0

 

 

 

 

 

 

 

4/0 Unless Noted

 

 

 

0W1860

 

 

 

 

 

 

 

0W1872

Q3

320A

4P

 

 

 

 

 

 

 

 

 

2A

 

 

 

 

 

 

 

 

 

 

 

Fx

 

 

 

 

 

 

 

 

 

 

 

0W1879 350A V

Bypass

 

 

 

320A

 

 

 

} 0W1884

 

 

 

0W1867

 

2/0

Q2

 

 

Bottom Feed

 

 

 

 

 

 

V

 

 

Q1

 

Output

 

 

4P

 

Option

 

 

 

 

 

 

 

 

 

208V

 

V

360A 3P

 

FL=121A

0W1862

2A

0W1874

I

 

 

 

 

Mains

 

 

 

 

 

 

 

0W1864

 

 

 

 

 

 

 

S

A

 

2A

Input

 

0W1873

 

2/0

 

 

 

 

 

 

Symmetra

 

 

 

 

 

 

500

 

 

 

 

 

 

 

 

 

 

MCM

 

 

 

 

 

 

 

 

 

 

 

AC

 

 

 

 

 

PX

 

 

 

 

 

 

 

 

 

 

 

80kW

 

 

 

 

 

 

Mains

 

 

 

 

 

 

 

 

 

 

 

 

GND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Load Port

 

 

 

 

 

 

 

 

 

 

 

 

Option

 

 

This drawing and specifications herein are the property of American Power Conversion

and shall not be reproduced or copied or used in whole or par as the basis for the manufacture or sale of items without written permission from APC.

80A

I

80A I

80A

I

80A I

20A

I

20A

I

 

 

I

20A

I

I

20A

I

 

42-Position

400-Amp Rated

Panel

VVoltage Monitoring(RMS) I Current Monitoring

2A Dual Aux Switch

AAux Switch S Shunt Trip

Lamps

80A

Sub Feeds

Appendix B : Single-Line

81

Diagrams

Image 91
Contents Installation and Start-Up Page Page Page About this Manual Page Contents Installation Procedures Appendix a System Operation Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Maintenance performed while the PDU is receiving input power Installation/MaintenanceEmergency Power Off EPO Total Power OffEMI InfraStruXure PDU DimensionsSymmetra PX UPS NetShelter VX Enclosure Battery EnclosureRack Distribution Panel Space Considerations Component Maximum Weight Weight ConsiderationsSymmetra PX UPS Heat OutputProcedures requiring a licensed electrician Electrical Requirements and SpecificationsElectrical requirements Overview Cross Tie Output Circuit BreakerPduups Emergency Power Off EPOBasic Installation Procedure Licensed electrician must connect utility power Start the system Tool Supplied? Tools RequiredInfraStruXure System-Installation and Start-Up Level the PDU, UPS, RDP, NetShelter and Battery Enclosures Installation ProceduresExchange Side Panels Connect Battery Enclosure communication cables Attach the PDU, UPS, and Battery Enclosure How to ensure that all power is off Ensure that All Power is OffInstallation Procedures Ensure that All Power is Off Connect Utility Conductors to the PDU Connect AC Power and Control Wiring Equipment Connect control wiring Jumper wire must be installed in position 13 Connect DC Power Wiring UPS Cascade Battery EnclosuresBattery Enclosure Symmetra PX UPS EPO Connect an Emergency Power Off SwitchContact Closure-Normally Open Problem Action Safety warnings ATS 0 ATS 1 ATS ATS EN Relay output specifications How to connect contacts to the PDU monitoring unitInfraStruXure System-Installation and Start-Up Cable Ladders for overhead wiring across rows Install the InfraStruXure Manager and Hub or Switch Install InfraStruXure Rack-Mount DevicesInstall the Rack Automatic Transfer Switches ATS Install the Rack Power Distribution Units PDURoute and Attach Overhead Wiring Route and attach power cables to equipment racks Installation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Connect network cables to components Route Data Cables to the InfraStruXure Manager Hub or SwitchOverhead routing Page Ensure that all power is off Start-Up ProcedureStart-Up Procedure InfraStruXure System Use two people to lift and install battery units Apply power to the systemStart-Up Procedure InfraStruXure System PowerView RM Rev 000 English Please wait Verify UPS battery operation UPS load is on Press any key Verify proper voltage and phase rotation on the PDU Start the UPS PowerView RM Rev 000 English Please wait Close turn on the Q2 circuit breaker on the PDU Page Start-Up Procedure InfraStruXure System Page Power the PDU Distribution Circuit Breakers Close Cross-Tie Configure the InfraStruXure Manager Page Appendix a System Operation How to Transfer the UPS into Maintenance Bypass OperationAppendix a System Operation UPS is now in maintenance bypass operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort How to Ensure Total Power Off Appendix a System Operation How to Apply Power to the System Fuel% Load% 208V out000V 60Hz Runtime 1hr 2m Top-Level Status Screen Appendix a System Operation Appendix Appendix B Single Appendix B Single-Line Diagrams Page Changes by page number General changesPage Index InfraStruXure System-Installation and Start-Up UPS Page Page 990-1467B