American Power Conversion InfraStruXureTM System manual Appendix B Single

Page 90

80

80kW PDU with System Bypass 208V Input, Dual-feed, with Cross Tie Output Breaker, without a Transformer

Appendix B : Single-

InfraStruXure System—Installation and Start-Up

500

MCM

Bypass 208V

Input

Bottom Feed }

Option 0W1785

500

MCM

AC 208V

Input

Bottom Feed}

Option 0W1884

GEC

GND

AC

Input

GND

Bypass

Input

GND

 

 

 

All Wiring

 

H3

 

 

 

 

 

 

 

 

2/0

 

 

4/0 Unless Noted

 

 

 

 

 

 

 

0W1881

Q3

320A

4P

 

 

 

 

 

 

s

2A

 

Dual Feed Option

 

 

 

 

 

 

 

V

 

 

 

F1

 

 

 

 

S2

 

 

 

 

 

 

 

 

 

 

160A 3P

 

 

 

 

400A

 

 

 

 

 

 

 

 

 

 

 

 

 

3P

 

208V

 

 

 

 

 

 

 

 

 

 

 

Bypass

 

 

 

0W1879

V

 

 

 

A

0W18697

 

 

2/0

 

 

 

 

 

 

 

 

 

 

 

 

 

S1

 

 

 

 

 

 

Output

 

 

 

 

Q1

 

 

FL=121A

 

400A

 

 

 

 

 

0W1862

 

 

 

360A 3P

 

 

3P

 

 

 

 

 

V

 

 

Mains

 

208V

 

 

 

 

 

 

 

 

 

S

A

0W1811

 

2A

0W1864

Input

 

0W1873

 

 

 

 

 

 

 

 

 

 

 

0W1901

 

Symmetra

 

 

 

 

 

 

 

PX

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

80kW

 

 

 

400A

 

Cross Tie

 

 

 

 

 

3P

 

Option

 

 

 

 

 

500 MCM

 

(Dual Feed)

 

 

 

 

 

 

 

 

 

 

 

0W1860

 

 

 

 

 

 

 

 

80A

I

 

 

 

 

80A

 

 

 

 

I

 

 

 

 

80A

 

 

 

 

I

 

 

 

 

80A

 

 

 

 

I

 

 

 

 

 

H2

 

 

 

20A

I

 

 

 

 

 

320A

 

 

20A

Q2

 

V

I

4P

 

 

 

 

 

 

I

 

2A

0W1874

I

 

 

 

I

 

 

 

20A

 

 

 

 

 

2/0

20A

I

I

 

 

 

 

42-Position

 

 

400-Amp Rated

 

Panel

 

Load Port

 

 

Option

 

 

V Voltage Monitoring (RMS)

80A

Sub Feeds

Line Diagrams

X-Tie

Bottom Feed

} 0W1887

GND

Option

Output

 

X-Tie

 

 

Output

This drawing and specifications herein are the property of American Power Conversion

and shall not be reproduced or copied or used in whole or par as the basis for the manufacture or sale of items without written permission from APC.

I Current Monitoring

2A Dual Aux Switch

AAux Switch S Shunt Trip

Lamps

Image 90
Contents Installation and Start-Up Page Page Page About this Manual Page Contents Installation Procedures Appendix a System Operation Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Installation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPOEMI Dimensions InfraStruXure PDUSymmetra PX UPS Battery Enclosure NetShelter VX EnclosureRack Distribution Panel Space Considerations Weight Considerations Component Maximum WeightHeat Output Symmetra PX UPSElectrical Requirements and Specifications Procedures requiring a licensed electricianElectrical requirements Cross Tie Output Circuit Breaker OverviewEmergency Power Off EPO PduupsBasic Installation Procedure Licensed electrician must connect utility power Start the system Tools Required Tool Supplied?InfraStruXure System-Installation and Start-Up Installation Procedures Level the PDU, UPS, RDP, NetShelter and Battery EnclosuresExchange Side Panels Connect Battery Enclosure communication cables Attach the PDU, UPS, and Battery Enclosure Ensure that All Power is Off How to ensure that all power is offInstallation Procedures Ensure that All Power is Off Connect Utility Conductors to the PDU Connect AC Power and Control Wiring Equipment Connect control wiring Jumper wire must be installed in position 13 Connect DC Power Wiring Cascade Battery Enclosures UPSBattery Enclosure Symmetra PX UPS Connect an Emergency Power Off Switch EPOContact Closure-Normally Open Problem Action Safety warnings ATS 0 ATS 1 ATS ATS EN How to connect contacts to the PDU monitoring unit Relay output specificationsInfraStruXure System-Installation and Start-Up Cable Ladders for overhead wiring across rows Install the Rack Power Distribution Units PDU Install InfraStruXure Rack-Mount DevicesInstall the Rack Automatic Transfer Switches ATS Install the InfraStruXure Manager and Hub or SwitchRoute and Attach Overhead Wiring Route and attach power cables to equipment racks Installation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Route Data Cables to the InfraStruXure Manager Hub or Switch Connect network cables to componentsOverhead routing Page Start-Up Procedure Ensure that all power is offStart-Up Procedure InfraStruXure System Apply power to the system Use two people to lift and install battery unitsStart-Up Procedure InfraStruXure System PowerView RM Rev 000 English Please wait Verify UPS battery operation UPS load is on Press any key Verify proper voltage and phase rotation on the PDU Start the UPS PowerView RM Rev 000 English Please wait Close turn on the Q2 circuit breaker on the PDU Page Start-Up Procedure InfraStruXure System Page Power the PDU Distribution Circuit Breakers Close Cross-Tie Configure the InfraStruXure Manager Page How to Transfer the UPS into Maintenance Bypass Operation Appendix a System OperationAppendix a System Operation UPS is now in maintenance bypass operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort How to Ensure Total Power Off Appendix a System Operation How to Apply Power to the System Fuel% Load% 208V out000V 60Hz Runtime 1hr 2m Top-Level Status Screen Appendix a System Operation Appendix Appendix B Single Appendix B Single-Line Diagrams Page General changes Changes by page numberPage Index InfraStruXure System-Installation and Start-Up UPS Page Page 990-1467B