
Start-Up Procedure: InfraStruXure System
7.Install at least one power module in the Symmetra PX UPS.
Install power modules starting from the lowest available shelf. Push each module completely into the enclosure.
Use two people to lift and install power modules.
Heavy
8.Secure the power module:
a.Tighten the screws on each side of the power module.
b.Turn the locking latch clockwise until the arrow on the knob faces the power module.
The power module will not start unless the locking latch is engaged.
Note
52 | InfraStruXure |