American Power Conversion PD60H5HK1, PDRPPH1000 manual Volt-Meter Screen

Page 17

Volt-Meter Screen

From the Volt-Meterscreen, you can select the following items:

Output Voltage Displays each phase-to-phase output voltage (e.g., L1-2for phase L1 to phase L2) and each phase-to-neutral output voltage (e.g., L1 for phase L1 to neutral).

Input Voltage Displays each phase-to-phase input voltage (e.g., L1-2for phase L1 to L2), or each phase-to-neutral input voltage (e.g., L1 for phase L1 to neutral).

60kW InfraStruXure PDU—Operation and Configuration

9

Image 17
Contents 60kW InfraStruXure PDU Page About This Manual How to find updates to this manualAudience Companion manualsPage Contents Overview Communication Configuration Product Information Safety symbols used in this manual SafetyCross-reference symbols used in this manual OverviewUnpacking/moving Installation/maintenanceTotal Power Off Emergency Power Off EPO Page        PDU Display InterfaceNavigating through screens Top-level status screensTop-level menu screen Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Overview Contacts ScreenInput Contacts Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Main Input Breakers ScreenNew Logged Items Alarms ScreenEntire Log Clear LogConfig Global AlarmLoading Limits Voltage LimitsAlarm Condition Explanation PDU AlarmsBranch Ckt Limits Panel ScreenBranch Ckt Loading On the top right distribution panel Panel ConfigurationAssociated circuit breakers occupying positions 08, 10, Global Panel Config System Password Config ScreenSystem/Network Date/TimeInput Config Electrical ConfigOutput Config Manufacturer DataSystem ID Factory DefaultsFirmware Updates Front view OverviewInfraStruXure PDU Front view interior Rear view of PDU with transformer interior Rear view of PDU without transformer interior PDU monitoring unit Arm/Test rocker switchUser connection plate System Operation How to Apply Power to the SystemPower the PDU distribution circuit breakers For PDU with transformer Open turn How to Ensure Total Power OffInfraStruXure PDU Management Options Communication ConfigurationInfraStruXure Manager Network management interfacesConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 60kW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsBreakers Power CablesPDU Orderable Part List Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU Customizing and Updating the PDU Overview How to connect contacts to the PDU monitoring unit Contact closure 24VAC 24VDC Contact closure is recommended How to Test the Emergency Power Off SwitchTesting the switch On the previous page for proper Upgrading the PDU monitor processor How to Download Firmware UpgradesDownloading firmware upgrades from a local computer Xmodem Page Electrical With Transformer Without Transformer SpecificationsCompliance Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to Contact APC How to Obtain ServiceChanges by page number Appendix a Changes in This ManualGeneral changes Page Index SSH Page Page Page APC Worldwide Customer Support