American Power Conversion PDRPPH1000, PD60H5HK1 manual Ssh

Page 72

Network management interface

accessing on a configured PDU, 39

configuration, 3342

recovering from a lost password, 42

Network port, on monitoring unit, 9 Neutral bar, location of, 46 Neutral wire, location of, 46

O

Operation, 2930

applying power to the system, 29

total power off, ensuring, 30 Orderable part list, 44

P

Panel screen, 2325 Password

protected screens, 13 recovering from a lost, 42

PE bar, location of, 46 PE wire, location of, 46 Physical specifications, 53 Power cables

adding to the PDU, 4546 location of, 5 orderable parts, 44

R

Relay output specifications, 53 Reset button, on monitoring unit, 9

S

Safety, 13

symbols used in this manual, 1 warnings, 23

SCP access to the PDU, 41

Screens. See display interface or entry under individual screen name.

Service, obtaining, 58 Setting the password, 26 Shielding trough, location of, 5 SNMP access to the PDU, 40 Specifications, 5354

SSH

for accessing a network management interface, 3940

T

TCP/IP configuration options, 34 Telnet

for accessing a network management interface, 3940

Time/date configuration, 26 Top-level menu screen, 12 Top-level status screens, 12 Total power off procedure, 2, 30

U

Updates

to firmware, 28, 52 to this manual, i

User connection plate detailed description, 10 location, 6

User/EPO contacts port, 9

V

Volt-meter screen, 15

W

Warnings, 23

Emergency Power Off (EPO), 3, 51

EMI, 3

for maintenance while the PDU is receiving input power, 2

installation/maintenance, 2 total power off, 2 unpacking/moving, 2

Warranty, 5556 Web interface

accessing a Network management interface through, 39

for PDU management, 31

64

60kW InfraStruXure PDU—Operation and Configuration

Image 72
Contents 60kW InfraStruXure PDU Page How to find updates to this manual About This ManualAudience Companion manualsPage Contents Overview Communication Configuration Product Information Safety Safety symbols used in this manualCross-reference symbols used in this manual OverviewInstallation/maintenance Total Power OffUnpacking/moving Emergency Power Off EPO Page PDU Display Interface       Top-level status screens Top-level menu screenNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Contacts Screen OverviewInput Contacts Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Breakers Screen Main InputAlarms Screen New Logged ItemsEntire Log Clear LogGlobal Alarm ConfigLoading Limits Voltage LimitsPDU Alarms Alarm Condition ExplanationPanel Screen Branch Ckt LoadingBranch Ckt Limits Panel Configuration Associated circuit breakers occupying positions 08, 10,On the top right distribution panel Global Panel Config Config Screen System PasswordSystem/Network Date/TimeElectrical Config Input ConfigOutput Config Manufacturer DataFactory Defaults Firmware UpdatesSystem ID Overview InfraStruXure PDUFront view Front view interior Rear view of PDU with transformer interior Rear view of PDU without transformer interior Arm/Test rocker switch PDU monitoring unitUser connection plate How to Apply Power to the System Power the PDU distribution circuit breakersSystem Operation How to Ensure Total Power Off For PDU with transformer Open turnCommunication Configuration InfraStruXure PDU Management OptionsInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguring the Network Management Interface Configuration OverviewConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Use apc for the User Name and PasswordRemote access to the control console Use apc for both User Name and Password Control consoleChoose Network from the Control Console menu Web interface Snmp FTP and SCP 60kW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUPower Cables PDU Orderable Part ListBreakers How to Add Circuit Breakers and Power Cables Add a power cable to the PDUAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to connect contacts to the PDU monitoring unit How to Test the Emergency Power Off Switch Contact closure 24VAC 24VDC Contact closure is recommendedTesting the switch On the previous page for proper How to Download Firmware Upgrades Downloading firmware upgrades from a local computerUpgrading the PDU monitor processor Xmodem Page Specifications Electrical With Transformer Without TransformerCompliance InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to Contact APCAppendix a Changes in This Manual General changesChanges by page number Page Index SSH Page Page Page APC Worldwide Customer Support