Configuring and testing. Configuring and testing of the switch is done through the EPO interface on the PDU monitoring unit. The figure to the right shows the PDU monitoring unit and the location of the EPO LEDs and DIP switches.

Testing the switch

1.Before testing the EPO switch, verify that the EPO DIP switches on the PDU monitoring unit are configured properly for the signal type you are using. The labels above the switches and the following figure show the correct settings for both the Normally Open (NO) and Normally Closed (NC) position.

Location of switches on PDU monitoring unit

2.Test the EPO switch to ensure that it is wired and working correctly:

a.Place the Arm/Test rocker switch in the Test position. The EPO state LEDs will be off and the PDU display interface will show the following alarm (in addition to any other active alarms):

Active Alarm xxofxx

EPO Ready to Test

b.Engage the EPO switch. (If your switch is momentary, engage it with one person watching the EPO state LEDs, and another at the EPO switch.)

50

60kW InfraStruXure PDU—Operation and Configuration

Image 58
Contents 60kW InfraStruXure PDU Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents Overview Communication Configuration Product Information Cross-reference symbols used in this manual SafetySafety symbols used in this manual OverviewTotal Power Off Installation/maintenanceUnpacking/moving Emergency Power Off EPO Page PDU Display Interface       Top-level menu screen Top-level status screensNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Input Contacts Contacts ScreenOverview Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Breakers Screen Main InputEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Global AlarmConfig Voltage LimitsPDU Alarms Alarm Condition ExplanationBranch Ckt Loading Panel ScreenBranch Ckt Limits Associated circuit breakers occupying positions 08, 10, Panel ConfigurationOn the top right distribution panel Global Panel Config System/Network Config ScreenSystem Password Date/TimeOutput Config Electrical ConfigInput Config Manufacturer DataFirmware Updates Factory DefaultsSystem ID InfraStruXure PDU OverviewFront view Front view interior Rear view of PDU with transformer interior Rear view of PDU without transformer interior Arm/Test rocker switch PDU monitoring unitUser connection plate Power the PDU distribution circuit breakers How to Apply Power to the SystemSystem Operation How to Ensure Total Power Off For PDU with transformer Open turnInfraStruXure Manager Communication ConfigurationInfraStruXure PDU Management Options Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Snmp FTP and SCP 60kW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List Power CablesBreakers Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to connect contacts to the PDU monitoring unit How to Test the Emergency Power Off Switch Contact closure 24VAC 24VDC Contact closure is recommendedTesting the switch On the previous page for proper Downloading firmware upgrades from a local computer How to Download Firmware UpgradesUpgrading the PDU monitor processor Xmodem Page Specifications Electrical With Transformer Without TransformerCompliance InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to Contact APCGeneral changes Appendix a Changes in This ManualChanges by page number Page Index SSH Page Page Page APC Worldwide Customer Support