American Power Conversion PD60H5HK1 Loading Limits, Voltage Limits, Other Limits, Global Alarm

Page 23

PDU Display Interface

Alarm Setup

Use this option of the Alarms screen to access the following options:

Loading Limits

Configure the following in amps and as a percentage of full load:

 

Out High: The upper limit for output current

 

Out Low: The lower limit for output current

 

Out Neut: The upper limit for current on the neutral wire for

 

 

the output phases

Voltage Limits

Configure the following as a percentage under or over the rated

 

voltage:

 

Input: The allowed range for input voltage

 

Output: The allowed range for output voltage

Other Limits

Configure this limit:

 

 

Frequency: The frequency variation, in hertz, that is acceptable

 

 

for the output current.

Global Alarm

Set all the loading limits or all the voltage limits simultaneously as a

Config

percentage of full load:

 

Load Limits: Set the same percentage upper limit for output

 

 

current and current on the neutral wire, and the lower limit for

 

 

output current. (Use the Loading Limits option to set these

 

 

thresholds individually.)

Volt Limits: Set the same percentage for the high and low thresholds for input and output voltage. (Use the Voltage Limits option to set these thresholds individually.)

Select Apply Now and then YES to implement your changes.

Alarm Beeper

Use this option of the Alarms screen to turn the alarm beeper ON or OFF.

60kW InfraStruXure PDU—Operation and Configuration

15

Image 23
Contents 60kW InfraStruXure PDU Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents Overview Communication Configuration Product Information Overview SafetySafety symbols used in this manual Cross-reference symbols used in this manualUnpacking/moving Installation/maintenanceTotal Power Off Emergency Power Off EPO Page        PDU Display InterfaceNavigating through screens Top-level status screensTop-level menu screen Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Open or Closed Contacts ScreenOverview Input ContactsPDU Display Interface How to connect contacts to the PDU monitoring unit Main Input Breakers ScreenClear Log Alarms ScreenNew Logged Items Entire LogVoltage Limits Global AlarmConfig Loading LimitsAlarm Condition Explanation PDU AlarmsBranch Ckt Limits Panel ScreenBranch Ckt Loading On the top right distribution panel Panel ConfigurationAssociated circuit breakers occupying positions 08, 10, Global Panel Config Date/Time Config ScreenSystem Password System/NetworkManufacturer Data Electrical ConfigInput Config Output ConfigSystem ID Factory DefaultsFirmware Updates Front view OverviewInfraStruXure PDU Front view interior Rear view of PDU with transformer interior Rear view of PDU without transformer interior PDU monitoring unit Arm/Test rocker switchUser connection plate System Operation How to Apply Power to the SystemPower the PDU distribution circuit breakers For PDU with transformer Open turn How to Ensure Total Power OffNetwork management interfaces Communication ConfigurationInfraStruXure PDU Management Options InfraStruXure ManagerConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 60kW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsBreakers Power CablesPDU Orderable Part List Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU Customizing and Updating the PDU Overview How to connect contacts to the PDU monitoring unit Contact closure 24VAC 24VDC Contact closure is recommended How to Test the Emergency Power Off SwitchTesting the switch On the previous page for proper Upgrading the PDU monitor processor How to Download Firmware UpgradesDownloading firmware upgrades from a local computer Xmodem Page Electrical With Transformer Without Transformer SpecificationsCompliance Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to Contact APC How to Obtain ServiceChanges by page number Appendix a Changes in This ManualGeneral changes Page Index SSH Page Page Page APC Worldwide Customer Support