American Power Conversion PDRPPH1000 Use apc for both User Name and Password, Control console

Page 46

Communication Configuration

2.Use Ping with a size of 113 bytes to assign the IP address defined by the ARP command. For the IP address defined in step 1, use one of the following Ping commands:

Windows command format:

ping 156.205.14.141 -l 113

LINUX command format:

ping 156.205.14.141 -s 113

3.Use Telnet to access the InfraStruXure PDU at its newly assigned IP address. For example: telnet 156.205.14.141

4.Use apc for both User Name and Password.

5.See “Control console” on this page to finish the configuration.

Control console

After you log on at the control console, as described in “Local access to the control console” on page 37 or “Remote access to the control console” on page 37:

1.Choose Network from the Control Console menu.

2.Choose TCP/IP from the Network menu.

3.If you are not using a BOOTP or DHCP server to configure the

TCP/IP settings, select the Boot Mode menu. Select Manual boot mode, and then press ESC to return to the TCP/IP menu. (Changes will take effect when you log out.)

4.Set the System IP, Subnet Mask, and Default Gateway address values.

5.Press CTRL-C to exit to the Control Console menu.

6.Log out (option 4 in the Control Console menu).

If you disconnected a cable during the procedure described in “Local access to the control console” on page 37, reconnect that cable and restart the associated service.

Note

38

60kW InfraStruXure PDU—Operation and Configuration

Image 46
Contents 60kW InfraStruXure PDU Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents Overview Communication Configuration Product Information Cross-reference symbols used in this manual SafetySafety symbols used in this manual OverviewTotal Power Off Installation/maintenanceUnpacking/moving Emergency Power Off EPO Page PDU Display Interface       Top-level menu screen Top-level status screensNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Input Contacts Contacts ScreenOverview Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Breakers Screen Main InputEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Global AlarmConfig Voltage LimitsPDU Alarms Alarm Condition ExplanationBranch Ckt Loading Panel ScreenBranch Ckt Limits Associated circuit breakers occupying positions 08, 10, Panel ConfigurationOn the top right distribution panel Global Panel Config System/Network Config ScreenSystem Password Date/TimeOutput Config Electrical ConfigInput Config Manufacturer DataFirmware Updates Factory DefaultsSystem ID InfraStruXure PDU OverviewFront view Front view interior Rear view of PDU with transformer interior Rear view of PDU without transformer interior Arm/Test rocker switch PDU monitoring unitUser connection plate Power the PDU distribution circuit breakers How to Apply Power to the SystemSystem Operation How to Ensure Total Power Off For PDU with transformer Open turnInfraStruXure Manager Communication ConfigurationInfraStruXure PDU Management Options Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Snmp FTP and SCP 60kW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List Power CablesBreakers Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to connect contacts to the PDU monitoring unit How to Test the Emergency Power Off Switch Contact closure 24VAC 24VDC Contact closure is recommendedTesting the switch On the previous page for proper Downloading firmware upgrades from a local computer How to Download Firmware UpgradesUpgrading the PDU monitor processor Xmodem Page Specifications Electrical With Transformer Without TransformerCompliance InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to Contact APCGeneral changes Appendix a Changes in This ManualChanges by page number Page Index SSH Page Page Page APC Worldwide Customer Support