American Power Conversion PD60H5HK1, PDRPPH1000 manual Configuring the Network Management Interface

Page 41

Configuring the Network Management Interface

Connect the InfraStruXure PDU to your network

1.Connect a Cat-5 network cable to the surge-protected ethernet port on the PDU user connection plate.

You can make connections from

inside the enclosure, or you can remove the user connection plate

and make your connections. Remove the plate using a Phillips or standard screwdriver to loosen the two captive screws. Use the

knockout in the plate to route cables to and from the user connections on the plate. If you

remove the plate, make sure that you do not disturb the existing connections.

2.Run the connected Cat-5 network cable through the knockout in the user connection plate to your network connection.

3.Configure the TCP/IP settings of the InfraStruXure PDU. See “Configuration Overview” on this page for further instructions.

Configuration Overview

You must configure the following TCP/IP settings before the InfraStruXure PDU can operate on a network:

IP address of the InfraStruXure PDU

Subnet mask

Default gateway

If a default gateway is unavailable, use the IP address of a computer that is located on the same subnet as the InfraStruXure PDU and that is usually running. The

Note InfraStruXure PDU uses the default gateway to test the network when traffic is very light. See “Watchdog Features” in the “Introduction” of the InfraStruXure Power Distribution Unit’s online Network Management User’s Guide for more information about the watchdog role of the default gateway.

60kW InfraStruXure PDU—Operation and Configuration

33

Image 41
Contents 60kW InfraStruXure PDU Page About This Manual How to find updates to this manualAudience Companion manualsPage Contents Overview Communication Configuration Product Information Safety symbols used in this manual SafetyCross-reference symbols used in this manual OverviewUnpacking/moving Installation/maintenanceTotal Power Off Emergency Power Off EPO Page        PDU Display InterfaceNavigating through screens Top-level status screensTop-level menu screen Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Overview Contacts ScreenInput Contacts Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Main Input Breakers ScreenNew Logged Items Alarms ScreenEntire Log Clear LogConfig Global AlarmLoading Limits Voltage LimitsAlarm Condition Explanation PDU AlarmsBranch Ckt Limits Panel ScreenBranch Ckt Loading On the top right distribution panel Panel ConfigurationAssociated circuit breakers occupying positions 08, 10, Global Panel Config System Password Config ScreenSystem/Network Date/TimeInput Config Electrical ConfigOutput Config Manufacturer DataSystem ID Factory DefaultsFirmware Updates Front view OverviewInfraStruXure PDU Front view interior Rear view of PDU with transformer interior Rear view of PDU without transformer interior PDU monitoring unit Arm/Test rocker switchUser connection plate System Operation How to Apply Power to the SystemPower the PDU distribution circuit breakers For PDU with transformer Open turn How to Ensure Total Power OffInfraStruXure PDU Management Options Communication ConfigurationInfraStruXure Manager Network management interfacesConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 60kW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsBreakers Power CablesPDU Orderable Part List Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU Customizing and Updating the PDU Overview How to connect contacts to the PDU monitoring unit Contact closure 24VAC 24VDC Contact closure is recommended How to Test the Emergency Power Off SwitchTesting the switch On the previous page for proper Upgrading the PDU monitor processor How to Download Firmware UpgradesDownloading firmware upgrades from a local computer Xmodem Page Electrical With Transformer Without Transformer SpecificationsCompliance Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to Contact APC How to Obtain ServiceChanges by page number Appendix a Changes in This ManualGeneral changes Page Index SSH Page Page Page APC Worldwide Customer Support