American Power Conversion PD60H5HK1, PDRPPH1000 Overview, Safety symbols used in this manual

Page 9

Safety

Overview

Save these instructions

This manual contains important instructions that must be followed during installation, operation, and maintenance of the PDU.

Safety symbols used in this manual

Indicates an electrical hazard, which, if not avoided, could result in injury or death.

Electrical

Hazard

Indicates a hazard, which, if not avoided, could result in personal injury or damage to product or other property.

Warning

Indicates a potential hazard which could result in damage to product or other property.

Caution

Indicates important information.

Note

Indicates a heavy load that should not be lifted without assistance.

Heavy

Indicates a standby state. When in standby, the unit is not operating, but it may still contain hazardous voltage. It is not safe to service until the equipment is disconnected from all sources of electrical power.

Cross-reference symbols used in this manual

Indicates that more information is available on the same subject in a different section of this manual.

Indicates that more information is available on the same subject in a different manual.

See also

60kW InfraStruXure PDU—Operation and Configuration

1

Image 9
Contents 60kW InfraStruXure PDU Page About This Manual How to find updates to this manualAudience Companion manualsPage Contents Overview Communication Configuration Product Information Safety symbols used in this manual SafetyCross-reference symbols used in this manual OverviewInstallation/maintenance Total Power OffUnpacking/moving Emergency Power Off EPO Page        PDU Display InterfaceTop-level status screens Top-level menu screenNavigating through screens Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Overview Contacts ScreenInput Contacts Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Main Input Breakers ScreenNew Logged Items Alarms ScreenEntire Log Clear LogConfig Global AlarmLoading Limits Voltage LimitsAlarm Condition Explanation PDU AlarmsPanel Screen Branch Ckt LoadingBranch Ckt Limits Panel Configuration Associated circuit breakers occupying positions 08, 10,On the top right distribution panel Global Panel Config System Password Config ScreenSystem/Network Date/TimeInput Config Electrical ConfigOutput Config Manufacturer DataFactory Defaults Firmware UpdatesSystem ID Overview InfraStruXure PDUFront view Front view interior Rear view of PDU with transformer interior Rear view of PDU without transformer interior PDU monitoring unit Arm/Test rocker switchUser connection plate How to Apply Power to the System Power the PDU distribution circuit breakersSystem Operation For PDU with transformer Open turn How to Ensure Total Power OffInfraStruXure PDU Management Options Communication ConfigurationInfraStruXure Manager Network management interfacesConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConfiguring the Network Management Interface Configuration OverviewConnect the InfraStruXure PDU to your network Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Use apc for the User Name and PasswordRemote access to the control console Use apc for both User Name and Password Control consoleChoose Network from the Control Console menu Web interface Snmp FTP and SCP 60kW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsPower Cables PDU Orderable Part ListBreakers How to Add Circuit Breakers and Power Cables Add a power cable to the PDUAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to connect contacts to the PDU monitoring unit Contact closure 24VAC 24VDC Contact closure is recommended How to Test the Emergency Power Off SwitchTesting the switch On the previous page for proper How to Download Firmware Upgrades Downloading firmware upgrades from a local computerUpgrading the PDU monitor processor Xmodem Page Electrical With Transformer Without Transformer SpecificationsCompliance Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to Contact APC How to Obtain ServiceAppendix a Changes in This Manual General changesChanges by page number Page Index SSH Page Page Page APC Worldwide Customer Support