4.0 Installation
4.6 Switch on load equipment
If you leave the load equipment switched on, you can use the UPS’s power on button as a master system on/off switch.
4.7 Switch on the UPS
The UPS and your loads become energized when you press and hold the power on button for a second. At
ensures that the UPS is working properly and that
its battery does not require replacement. If the battery is too weak to support the load during the test, the UPS immediately returns to
Note: If the red Overload indicator lights, the UPS is overloaded. Unplug equipment that does not require backing up, such as a printer, and restart the UPS. If the Replace Battery indicator lights, recharge the UPS over- night and retest.
Note: Refer to Section 7.0 for troubleshooting information.