6 F 3 H 1 0 0 1
Table 8.1 Startup Procedures (continued)
Step | Procedure | LCD/LED Status (After Execution) |
|
| ||
10 | Hold down the “UPS” |
|
|
|
|
|
| key (g in the Figure |
| UPS SUPPLY |
|
|
|
| 6.3.1 on page14) for at |
| 200[V] |
|
| |
| least 0.5 second. * |
|
|
| ||
|
| AC- I O | 50[%] |
|
| |
| → The will start the |
|
|
| ||
|
|
|
|
|
| |
| power supply |
|
|
|
|
|
| changing process. | ~ | ~ | ~ | UPS |
|
|
| AC INPUT | CONVERTER | INVERTER |
|
|
|
|
| FLOAT CHARGE |
| AC | ~ |
|
|
|
|
|
| |
|
| BATTERIES | EQUAL CHARGE |
| SWITCH |
|
|
|
|
|
|
| |
|
|
| DISCHARGE |
|
| AC OUTPUT |
|
| ~ |
|
| BYPASS |
|
|
| BYPASS INPUT |
|
|
| |
|
|
|
|
|
| |
|
| The "BYPASS" LED unlit and “UPS” LED lit. | ||||
11 | Wait several seconds |
|
|
|
|
|
| for the process to be |
| UPS SUPPLY |
|
|
|
| completed (change to |
| 200[V] |
|
| |
| UPS power supply). |
|
|
| ||
|
| AC- I O | 50[%] |
|
| |
| →This completes the |
|
|
| ||
|
|
|
|
|
| |
| UPS staartup |
|
|
|
|
|
| operation. | ~ | ~ | ~ | UPS |
|
|
| AC INPUT | CONVERTER | INVERTER |
|
|
|
|
| FLOAT CHARGE |
| AC | ~ |
|
|
|
|
|
| |
|
| BATTERIES | EQUAL CHARGE |
| SWITCH |
|
|
|
|
|
|
| |
|
|
| DISCHARGE |
|
| AC OUTPUT |
|
|
|
|
|
| |
|
| ~ |
|
| BYPASS |
|
|
| BYPASS INPUT |
|
|
| |
|
|
|
|
|
|
*If for some reason the AC switch dose not function, contact the Toshiba Service Center. Do not manually operate the solenoid contactor (which is part of AC switch).
- 30 -