APC 6000 user manual UPS theory of operation, Unitary UPS

Page 18

UPS theory of operation

Unitary UPS

The unitary MGETM GalaxyTM 6000

rectifier-charger;

The load and Mains 2 operate at 50

UPSs are made up of five modular

battery;

or 60 Hz.

sub-assemblies:

three-phase inverter;

 

 

static switch;

 

 

maintenance bypass.

 

 

 

 

 

Mains 1 power up

the inverter receives power from the rectifier-charger and supplies power to the load. There is no direct connection between Mains and load;

the battery is charged or the charge maintained.

static by-pass switch

Mains 2

rectifier-

chargerinverter

Mains 1

battery

load

Mains 1 power down

the inverter receives power from the battery and supplies power to the load;

the battery discharges.

Major overload

Mains 2

rectifier- charger

Mains 1

static by-pass switch

inverter

battery

load

Mains 2 supplies power to the load via the static switch;

the inverter is shut down;

the inverter starts-up automatically as soon as overload is removed;

power is transferred without affecting the load.

Maintenance

static by-pass switch

Mains 2

rectifier-

chargerinverter

Mains 1

load

battery

Mains 2 supplies power to the load via the maintenance bypass;

the rectifier-charger and inverter are shut down and disconnected from all sources of power.

Mains 2

rectifier- charger

Q1

Mains 1

Q3BP

static by-pass switch

Q4S

inverter

Q5N

load

QF1

battery

Page 18 - 6739389EN/FB

Image 18
Contents Mgetm GalaxyTM GTC link communication interface2 6739389EN/FB Contents ACQ module PresentationIntroduction COM moduleCommunication settings InterfaceJbus protocol Principle Synchronizing data exchangesDescription of request and response frames Checking received messages on the slave side Functions Function 1 and 2 read N bitsFunction 3 and 4 read N words Function 5 writing a bitFunction 8 reading error diagnosis counters Function 6 writing a wordFunction 11 reading event counters Function 15 writing n consecutive bitsFunction 16 writing n consecutive words MSB LSB MSB LSB MSBCRC 16 algorithm Example of CRC computation Example of CRC 16 computation in C using table lookup Table of Most Significant Bytes for CRC16 ComputationJbus protocol UPS theory of operation Unitary UPSParallel connected UPS with Static Switch cubicle Operation without batteryUPS without Mains Operation with battery Block diagram Unitary UPSMeasured quantities Normal operation Load on battery Main status bits UPS operating informationOperating modes Load on Mains Load on bypass Parallel connected UPS Normal operation Load on battery Disconnected Main status bits of system operationsStatic Switch cubicle Static Switch Main indicators of system operationsNormal operation Load on Mains Load on bypass System information Example of read data array commands sent by the terminalSample commands List of variable fields Message formatGeneral definitions Signaling field Tables of measured dataCurrent fields Power fields Frequency fields Voltage fieldsBattery and adjustments fields Tables of binary dataRectifier-charger Inverter ConnectivityTable of control devices Global informationGlossary of information descriptors Word addressInverter stack overload 0=no/1=overload Word address 4A Word address 4CWord address 4D Word address 4E summaryC10 call reset 0= not activated / 1=activated Word address C1
Related manuals
Manual 46 pages 29.39 Kb