3Com 4210G manual Safety Precautions, Installation Site

Page 27

2 Preparing for Installation

Safety Precautions

Before you install or remove any components from the Switch or carry out any maintenance procedures, you must read the 3Com Switch Family Safety and Regulatory Information document enclosed with your switch.

To avoid damage to human body and devices, please read the following safety recommendations carefully before installing the Switch 4210G. The recommendations do not cover every possible hazardous condition.

z

z

z

z

z z

z

Before cleaning the switch, unplug the power plug of the switch first. Do not clean the switch with wet cloth or liquid.

Do not place the switch near water or in a damp environment. Prevent water or moisture from entering the switch chassis.

Do not place the switch on an unstable case or desk. The switch might be damaged severely in case of a fall.

Ensure proper ventilation of the equipment room and keep the ventilation vents of the switch free of obstruction.

Make sure that the operating voltage is the same as the voltage labeled on the switch.

Do not open the chassis while the switch is operating or when electrical hazards are present to avoid electrical shocks.

When replacing interface modules, wear ESD-preventive gloves to avoid damaging the cards.

Installation Site

The Switch 4210G must be used indoors. You can mount your switch in a rack or on a workbench, but make sure:

z

z

z

z

Adequate clearance is reserved at the air inlet/exhaust vents for ventilation. The rack or workbench has a good ventilation system.

The rack is sturdy enough to support the device and its accessories. The rack or workbench is well earthed.

To ensure normal operation and long service life of your switch, install it in an environment that meets the requirements described in the following subsections.

2-1

Image 27
Contents 3Com Switch 4210G Family Environmental Statement Conventions Chapter ContentsAbout This Manual OrganizationConvention Description Related DocumentationObtaining Documentation Create FolderTable of Contents Page Iii 4210G 24-Port 4210G 48-Port 4210G PWR 4210G NT OverviewVDC Switch 4210G 24-Port Introduction to Switch 4210GSwitch 4210G 48-Port Switch 4210G PWR 24-Port Switch 4210G PWR 48-Port Switch 4210G NT 24-Port Switch 4210G NT 48-Port PortsConsole Port Specification 10/100/1000Base-T Ethernet Port1000Base-X SFP Port LEDs LEDsCombo Port Model SFP port 10/100/1000Base-T Ethernet portStatus Description Port Mode LEDSystem Status LED RPS Status LEDSeven-Segment LED StatusSystem status Seven-segment LED Description 10/100/1000Base-T Auto-Sensing Ethernet Port Status LED 1000Base-X SFP Port Status LED Status Description Port mode Ethernet portMark Status Description Optional Interface ModulesInterface Module Status LED Short-haul Dual-Port 10 GE CX4 Interface ModuleDual-Port 10 GE XFP Interface Module CX4 Cable Connector type LengthCentral Max Transceiver Connector Fiber Transmission One-port 10 GE XFP Interface ModuleDistance Connector Fiber Transmission Cable type Distance Dual-Port 10 GE SFP+ Interface ModuleTransceiver Central Max 22 SFP+ cable Description of LEDs of Interface ModulesInstallation Site Safety PrecautionsGas Maximum concentration mg/m Temperature/HumidityCleanness Electromagnetic SusceptibilityLaser Safety Installation ToolsInstallation Flow of the Switch Installing the SwitchIntroduction to Mounting Bracket Configuration Type of rear Mounting Bracket Use Front Mounting Brackets to Install a SwitchModel Physical dimensions × W × D Configuration Type of front Mounting bracketUse Front Mounting Brackets and a Tray to Install a Switch Use Front and Rear Mounting Brackets to Install a Switch Page Page Mounting the Switch on a Workbench When a Grounding Strip is Available Connecting the Grounding CableWhere a Grounding Conductor Can be Buried Other Installation Sites Connecting the Power Cords Connecting the AC Power CordSwitch module Power supply Connection method Mode 16Connect an AC power cord to a horizontal AC power socket Connecting the RPS Power CordPage Installing an Interface Card Installing an Interface ModuleRemoving an Interface Module Installing Dedicated CX4/SFP+ CableRemoving Dedicated CX4/SFP+ Cable Installing Switches for an IRFTask Remarks Installation Flow for an IRFFor details, see Installing an Interface Module Drawing a Plan for an IRF with SwitchesConfigure the physical connection mode Page 29Cable connections for an IRF with 1-port interface modules Verifying the InstallationConsole Cable Setting up the Configuration EnvironmentConnecting the Console Cable RJ-45 Signal Direction DB-9Connection Procedure Setting Terminal Parameters4Set the serial port used by the HyperTerminal connection 6HyperTerminal window Booting the Switch Checking before Powering on the SwitchPowering on the Switch Describes the fields above 2Description on the fields Changing the Startup Mode Enter Y. The system displays the following information BUS Clock Speed 33MHz Memory Size 128MB Mac Address Page Loading Software Through the Boot ROM Menu Boot MenuIntroduction to Loading Modes Press Ctrl + B. The system displays Introduction to Xmodem Loading Software Using Xmodem Through Console PortROM file effective Required2Properties dialog box Cccccccccccccccccc CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCdone Loading host software Loading Software Using Tftp through Ethernet PortLoad File name Introduction to FTP Loading Software Using FTP Through Ethernet PortDescription Loading Software Through CLI Loading Software Using FTPUpdate the Boot ROM program on the switch Loading Software Using TftpSoftware Loading Failure Password Missing FailureMissing User Password Missing Boot ROM PasswordRPS&AC input Power Supply FailureAC input RPS inputFan Failure Mark State System status LEDSteady red Configuration System Failure Troubleshooting when there is no terminal displayTroubleshooting when the terminal display is illegible