3Com 4210G manual Connecting the Grounding Cable, When a Grounding Strip is Available

Page 38

Connecting the Grounding Cable

z

z

Correctly connecting the chassis grounding cable is crucial to the lightning protection and electromagnetic susceptibility (EMS) of a switch.

The power and grounding terminals in this section are for illustration only.

The power input end of the switch is connected with a noise filter, whose central ground is directly connected to the chassis, forming the so-called chassis ground (commonly known as PGND). This chassis ground must be securely connected to the earth so that the faradism and leakage electricity can be safely released to the earth, enhancing the EMS capability of the switch.

When a Grounding Strip is Available

When a grounding strip is available at the installation site, attach one end of the yellow-green grounding cable (PGND cable) of the switch to the grounding screw on the grounding strip (the grounding screw and the grounding hole are on the rear panel of the switch and are marked with a grounding sign). To do this, follow these steps:

Step1 Remove the grounding screw from the rear panel of the switch chassis.

Step2 Put the supplied OT terminal of the PGND cable on the grounding screw.

Step3 Fasten the grounding screw, which is attached with the OT terminal of the PGND cable, into the grounding screw hole with a screwdriver.

Figure 3-11Connect the PGND cable to the grounding hole of switch

(1) Rear panel of the switch

(2)

Grounding sign

(3)

Grounding hole

(4)

OT terminal

(5)

PGND cable

(6)

Grounding screw

To attach the other end of the PGND cable to the grounding strip in the equipment room, follow these steps:

3-9

Image 38
Contents 3Com Switch 4210G Family Environmental Statement Organization Chapter ContentsAbout This Manual ConventionsCreate Folder Related DocumentationObtaining Documentation Convention DescriptionTable of Contents Page Iii Overview 4210G 24-Port 4210G 48-Port 4210G PWR 4210G NTVDC Introduction to Switch 4210G Switch 4210G 24-PortSwitch 4210G 48-Port Switch 4210G PWR 24-Port Switch 4210G PWR 48-Port Switch 4210G NT 24-Port Console Port Switch 4210G NT 48-PortPorts 1000Base-X SFP Port Specification10/100/1000Base-T Ethernet Port Model SFP port 10/100/1000Base-T Ethernet port LEDsCombo Port LEDsRPS Status LED Port Mode LEDSystem Status LED Status DescriptionSystem status Seven-segment LED Description Seven-Segment LEDStatus 10/100/1000Base-T Auto-Sensing Ethernet Port Status LED Status Description Port mode Ethernet port 1000Base-X SFP Port Status LEDShort-haul Dual-Port 10 GE CX4 Interface Module Optional Interface ModulesInterface Module Status LED Mark Status DescriptionCX4 Cable Connector type Length Dual-Port 10 GE XFP Interface ModuleDistance Central Max Transceiver Connector Fiber TransmissionOne-port 10 GE XFP Interface Module Transceiver Central Max Connector Fiber Transmission Cable type DistanceDual-Port 10 GE SFP+ Interface Module Description of LEDs of Interface Modules 22 SFP+ cableSafety Precautions Installation SiteElectromagnetic Susceptibility Temperature/HumidityCleanness Gas Maximum concentration mg/mInstallation Tools Laser SafetyInstalling the Switch Installation Flow of the SwitchIntroduction to Mounting Bracket Configuration Type of front Mounting bracket Use Front Mounting Brackets to Install a SwitchModel Physical dimensions × W × D Configuration Type of rear Mounting BracketUse Front Mounting Brackets and a Tray to Install a Switch Use Front and Rear Mounting Brackets to Install a Switch Page Page Mounting the Switch on a Workbench Connecting the Grounding Cable When a Grounding Strip is AvailableWhere a Grounding Conductor Can be Buried Other Installation Sites Switch module Power supply Connection method Mode Connecting the Power CordsConnecting the AC Power Cord Connecting the RPS Power Cord 16Connect an AC power cord to a horizontal AC power socketPage Installing an Interface Module Installing an Interface CardInstalling Dedicated CX4/SFP+ Cable Removing an Interface ModuleInstalling Switches for an IRF Removing Dedicated CX4/SFP+ CableInstallation Flow for an IRF Task RemarksDrawing a Plan for an IRF with Switches For details, see Installing an Interface ModuleConfigure the physical connection mode Page Verifying the Installation 29Cable connections for an IRF with 1-port interface modulesRJ-45 Signal Direction DB-9 Setting up the Configuration EnvironmentConnecting the Console Cable Console CableSetting Terminal Parameters Connection Procedure4Set the serial port used by the HyperTerminal connection 6HyperTerminal window Powering on the Switch Booting the SwitchChecking before Powering on the Switch Describes the fields above 2Description on the fields Changing the Startup Mode Enter Y. The system displays the following information BUS Clock Speed 33MHz Memory Size 128MB Mac Address Page Introduction to Loading Modes Loading Software Through the Boot ROM MenuBoot Menu Press Ctrl + B. The system displays Loading Software Using Xmodem Through Console Port Introduction to XmodemRequired ROM file effective2Properties dialog box Cccccccccccccccccc CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCdone Loading Software Using Tftp through Ethernet Port Loading host softwareLoad File name Loading Software Using FTP Through Ethernet Port Introduction to FTPDescription Loading Software Using FTP Loading Software Through CLILoading Software Using Tftp Update the Boot ROM program on the switchMissing Boot ROM Password Password Missing FailureMissing User Password Software Loading FailureRPS input Power Supply FailureAC input RPS&AC inputSteady red Fan FailureMark State System status LED Troubleshooting when the terminal display is illegible Configuration System FailureTroubleshooting when there is no terminal display