3Com 4210G manual Installation Flow for an IRF, Task Remarks

Page 47

Installation Flow for an IRF

Figure 3-24Installation flow for an IRF

Table 3-4Description of the installation flow for an IRF of switches

No

 

 

Task

 

 

Remarks

 

 

 

 

 

Take the following into consideration:

 

 

 

Draw a plan for

 

z Number of IRF members and the bandwidth

 

 

 

 

z

Interface modules and cables

1

 

 

an IRF with

 

 

 

 

z

Physical connection mode( daisy chain connection or ring connection)

 

 

 

switches

 

 

 

 

 

z

Cable connection

 

 

 

 

 

 

 

 

 

 

For details, see Drawing a Plan for an IRF with Switches.

 

 

 

 

 

 

 

 

 

Install the IRF

 

For detailed installation procedures, see:

2

 

 

members to the

 

z

Installing the Switch into a 19-Inch Rack Using Mounting Brackets.

 

 

 

correct position

 

z

Mounting the Switch on a Workbench.

 

 

 

 

 

 

 

 

Connect

 

For details, see:

3

 

 

grounding

 

 

 

cables and

 

z

Connecting the Grounding Cable

 

 

 

power cords for

 

z

Connecting the Power Cords

 

 

 

the switches

 

 

 

 

 

 

 

 

 

 

 

 

 

3-18

Image 47
Contents 3Com Switch 4210G Family Environmental Statement Conventions Chapter ContentsAbout This Manual OrganizationConvention Description Related DocumentationObtaining Documentation Create FolderTable of Contents Page Iii 4210G 24-Port 4210G 48-Port 4210G PWR 4210G NT OverviewVDC Switch 4210G 24-Port Introduction to Switch 4210GSwitch 4210G 48-Port Switch 4210G PWR 24-Port Switch 4210G PWR 48-Port Switch 4210G NT 24-Port Console Port Switch 4210G NT 48-PortPorts 1000Base-X SFP Port Specification10/100/1000Base-T Ethernet Port LEDs LEDsCombo Port Model SFP port 10/100/1000Base-T Ethernet portStatus Description Port Mode LEDSystem Status LED RPS Status LEDSystem status Seven-segment LED Description Seven-Segment LEDStatus 10/100/1000Base-T Auto-Sensing Ethernet Port Status LED 1000Base-X SFP Port Status LED Status Description Port mode Ethernet portMark Status Description Optional Interface ModulesInterface Module Status LED Short-haul Dual-Port 10 GE CX4 Interface ModuleDual-Port 10 GE XFP Interface Module CX4 Cable Connector type LengthDistance Central Max Transceiver Connector Fiber TransmissionOne-port 10 GE XFP Interface Module Transceiver Central Max Connector Fiber Transmission Cable type DistanceDual-Port 10 GE SFP+ Interface Module 22 SFP+ cable Description of LEDs of Interface ModulesInstallation Site Safety PrecautionsGas Maximum concentration mg/m Temperature/HumidityCleanness Electromagnetic SusceptibilityLaser Safety Installation ToolsInstallation Flow of the Switch Installing the SwitchIntroduction to Mounting Bracket Configuration Type of rear Mounting Bracket Use Front Mounting Brackets to Install a SwitchModel Physical dimensions × W × D Configuration Type of front Mounting bracketUse Front Mounting Brackets and a Tray to Install a Switch Use Front and Rear Mounting Brackets to Install a Switch Page Page Mounting the Switch on a Workbench When a Grounding Strip is Available Connecting the Grounding CableWhere a Grounding Conductor Can be Buried Other Installation Sites Switch module Power supply Connection method Mode Connecting the Power CordsConnecting the AC Power Cord 16Connect an AC power cord to a horizontal AC power socket Connecting the RPS Power CordPage Installing an Interface Card Installing an Interface ModuleRemoving an Interface Module Installing Dedicated CX4/SFP+ CableRemoving Dedicated CX4/SFP+ Cable Installing Switches for an IRFTask Remarks Installation Flow for an IRFFor details, see Installing an Interface Module Drawing a Plan for an IRF with SwitchesConfigure the physical connection mode Page 29Cable connections for an IRF with 1-port interface modules Verifying the InstallationConsole Cable Setting up the Configuration EnvironmentConnecting the Console Cable RJ-45 Signal Direction DB-9Connection Procedure Setting Terminal Parameters4Set the serial port used by the HyperTerminal connection 6HyperTerminal window Powering on the Switch Booting the SwitchChecking before Powering on the Switch Describes the fields above 2Description on the fields Changing the Startup Mode Enter Y. The system displays the following information BUS Clock Speed 33MHz Memory Size 128MB Mac Address Page Introduction to Loading Modes Loading Software Through the Boot ROM MenuBoot Menu Press Ctrl + B. The system displays Introduction to Xmodem Loading Software Using Xmodem Through Console PortROM file effective Required2Properties dialog box Cccccccccccccccccc CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCdone Loading host software Loading Software Using Tftp through Ethernet PortLoad File name Introduction to FTP Loading Software Using FTP Through Ethernet PortDescription Loading Software Through CLI Loading Software Using FTPUpdate the Boot ROM program on the switch Loading Software Using TftpSoftware Loading Failure Password Missing FailureMissing User Password Missing Boot ROM PasswordRPS&AC input Power Supply FailureAC input RPS inputSteady red Fan FailureMark State System status LED Troubleshooting when the terminal display is illegible Configuration System FailureTroubleshooting when there is no terminal display