3Com 4210G Use Front Mounting Brackets to Install a Switch, Model Physical dimensions × W × D

Page 32

Figure 3-3Appearance of a rear mounting bracket

(1) Screw hole used to fix the mounting bracket to the cabinet (Use one M6 screw)

For the selection of front and rear mounting brackets, see Table 3-2.

Table 3-2Selection of mounting bracket for Switch 4210G

 

Model

 

 

Physical dimensions

 

 

 

 

(H × W × D)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Switch 4210G 24-Port

 

 

 

 

Switch 4210G

48-Port

 

43.6 × 440 × 300 mm

 

Switch 4210G

NT 24-Port

 

(1.72 × 17.32 × 11.81 in.)

 

Switch 4210G

NT 48-Port

 

 

 

 

 

 

 

 

Switch 4210G PWR 24-Port

 

43.6 × 440 × 420 mm

 

Switch 4210G

PWR 48-Port

 

(1.72 × 17.32 × 16.54 in.)

 

 

 

 

 

 

 

Configuration

type of front

mounting bracket

Standard

Standard

Configuration

type of rear

mounting

bracket

Standard

Use Front Mounting Brackets to Install a Switch

Only the Switch 4210G 24-Port, Switch 4210G 48-Port, Switch 4210G NT 24-Port, and Switch 4210G NT 48-Port support installation using front mounting brackets.

Follow these steps to mount a switch into a 19-inch standard cabinet:

Step1 Wear an ESD-preventive wrist strap and ensure a good skin contact and grounding.

Step2 Check the grounding and stability of the cabinet.

Step3 Take out the screws which are packed together with the front mounting brackets, and fix one end of mounting brackets to the switch, as shown in Figure 3-4.

3-3

Image 32
Contents 3Com Switch 4210G Family Environmental Statement Chapter Contents About This ManualOrganization ConventionsRelated Documentation Obtaining DocumentationCreate Folder Convention DescriptionTable of Contents Page Iii Overview 4210G 24-Port 4210G 48-Port 4210G PWR 4210G NTVDC Introduction to Switch 4210G Switch 4210G 24-PortSwitch 4210G 48-Port Switch 4210G PWR 24-Port Switch 4210G PWR 48-Port Switch 4210G NT 24-Port Console Port Switch 4210G NT 48-PortPorts 1000Base-X SFP Port Specification10/100/1000Base-T Ethernet Port LEDs Combo PortModel SFP port 10/100/1000Base-T Ethernet port LEDsPort Mode LED System Status LEDRPS Status LED Status DescriptionSystem status Seven-segment LED Description Seven-Segment LEDStatus 10/100/1000Base-T Auto-Sensing Ethernet Port Status LED Status Description Port mode Ethernet port 1000Base-X SFP Port Status LEDOptional Interface Modules Interface Module Status LEDShort-haul Dual-Port 10 GE CX4 Interface Module Mark Status DescriptionCX4 Cable Connector type Length Dual-Port 10 GE XFP Interface ModuleDistance Central Max Transceiver Connector Fiber TransmissionOne-port 10 GE XFP Interface Module Transceiver Central Max Connector Fiber Transmission Cable type DistanceDual-Port 10 GE SFP+ Interface Module Description of LEDs of Interface Modules 22 SFP+ cableSafety Precautions Installation SiteTemperature/Humidity CleannessElectromagnetic Susceptibility Gas Maximum concentration mg/mInstallation Tools Laser SafetyInstalling the Switch Installation Flow of the SwitchIntroduction to Mounting Bracket Use Front Mounting Brackets to Install a Switch Model Physical dimensions × W × DConfiguration Type of front Mounting bracket Configuration Type of rear Mounting BracketUse Front Mounting Brackets and a Tray to Install a Switch Use Front and Rear Mounting Brackets to Install a Switch Page Page Mounting the Switch on a Workbench Connecting the Grounding Cable When a Grounding Strip is AvailableWhere a Grounding Conductor Can be Buried Other Installation Sites Switch module Power supply Connection method Mode Connecting the Power CordsConnecting the AC Power Cord Connecting the RPS Power Cord 16Connect an AC power cord to a horizontal AC power socketPage Installing an Interface Module Installing an Interface CardInstalling Dedicated CX4/SFP+ Cable Removing an Interface ModuleInstalling Switches for an IRF Removing Dedicated CX4/SFP+ CableInstallation Flow for an IRF Task RemarksDrawing a Plan for an IRF with Switches For details, see Installing an Interface ModuleConfigure the physical connection mode Page Verifying the Installation 29Cable connections for an IRF with 1-port interface modulesSetting up the Configuration Environment Connecting the Console CableRJ-45 Signal Direction DB-9 Console CableSetting Terminal Parameters Connection Procedure4Set the serial port used by the HyperTerminal connection 6HyperTerminal window Powering on the Switch Booting the SwitchChecking before Powering on the Switch Describes the fields above 2Description on the fields Changing the Startup Mode Enter Y. The system displays the following information BUS Clock Speed 33MHz Memory Size 128MB Mac Address Page Introduction to Loading Modes Loading Software Through the Boot ROM MenuBoot Menu Press Ctrl + B. The system displays Loading Software Using Xmodem Through Console Port Introduction to XmodemRequired ROM file effective2Properties dialog box Cccccccccccccccccc CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCdone Loading Software Using Tftp through Ethernet Port Loading host softwareLoad File name Loading Software Using FTP Through Ethernet Port Introduction to FTPDescription Loading Software Using FTP Loading Software Through CLILoading Software Using Tftp Update the Boot ROM program on the switchPassword Missing Failure Missing User PasswordMissing Boot ROM Password Software Loading FailurePower Supply Failure AC inputRPS input RPS&AC inputSteady red Fan FailureMark State System status LED Troubleshooting when the terminal display is illegible Configuration System FailureTroubleshooting when there is no terminal display