12CHAPTER 2: INSTALLING THE BRIDGE
2Route the power and Ethernet cables through the large opening in the cradle. Figure 5 shows a cable being routed under the cradle.
Figure 5 Routing Cable Under the Cradle
3Connect the power and Ethernet cables to the ports on the Bridge.
4Snap the Bridge onto the cradle.
Installing the For additional security, install the locking bar in the cradle after the Bridge Locking Bar is mounted to the wall. Use your own lock to secure it in place.
To install the locking bar:
1Insert the locking bar through the opening in the side of the cradle, as shown in Figure 6.
Figure 6 Inserting the Locking Bar