6.0 Timing Charts
6.1 RTS/CTS Flow Control Timing Chart
PC SIDE SIGNAL |
|
|
| ||
RTS | 1 |
|
|
| 5 |
| T1 |
|
|
| |
CTS | 2 |
| 4 | T3 | |
TXD |
|
|
| T2 |
|
| 3 | Command |
| T4 | |
|
|
|
RXD
6
C-Response
Mark | Duration period | ||
| Min. | Max. |
|
T1 | - | 300ms | |
T2 | 0ms | 200ms | |
T3 | 10ms |
| |
T4 | 10ms | *1 |
|
1If the PC is ready to communicate with the
2Once the
3After the PC recognizes the CTS is ON, the PC can send the command packet to the
4Once the
5After finishing the operation, the
6At the same time, the
Note: If the
58