Graco 311511G Setup, Locate Reactor A-20 Electrical Requirements, Determine Power Source

Page 14

Setup

Setup

Locate Reactor A-20

Electrical Requirements

1.Locate Reactor A-20 on a level surface and bolt in place to the floor with 3/8 in. (10 mm) bolts.

Two bolts through the 2 in. (50 mm) deep caster bushings in the rear.

Two bolts through the 3-5/8 in. (168 mm) deep caster bushings in the front.

2.Do not expose Reactor A-20 to rain.

3.If you need to move the machine, add provided casters.

4.Lift with hoist only from bar spanning across top of cart.

Determine Power Source

Reactor A-20 can be wired to 3 types of power source:

230 Volt / 1 Phase

230 Volt / 3 Phase Delta

380 Volt / 3 Phase WYE

(220 Volts to Neutral)

Improper wiring may cause electric shock or other serious injury if work is not performed properly. Have a qualified electrician connect power and ground to main power switch terminals. Ensure your installation complies with all National, State, and Local safety and fire codes.

Also ensure that incoming power is disconnected and locked out at the source.

NOTICE

Ensure main power source meets all electrical requirements specified on nameplate of proportioning unit. Also ensure main power source has a dedicated fuse disconnect. Power cord is not supplied.

14

311511G

Image 14
Contents Reactor A-20 Contents Related ManualsPart SystemsProportioner 50 ft 15 m 10 ft 3 m ApprovalsElectric Shock Hazard Fire and Explosion Hazard Moving Parts Hazard Typical Installation, without Circulation Key for FIGTypical Installation, with Circulation Isocyanate Hazard Moisture Sensitivity of IsocyanatesFoam Self-Ignition Keep Components a and B SeparateTypical Installation Component IdentificationKey Controls and Indicators AP Park/Run SwitchPressure Relief Procedure FlushingLocate Reactor A-20 Electrical Requirements SetupDetermine Power Source Configure to Supply Power Step One Connect Electrical CordPower Jumper Location Terminal BlocksFluid Supply Connections Iso Pump Lubrication System SetupGround System Air Supply ConnectionConnect FTS and Heated Dual Whip Hose Recirculation / Pressure Relief Lines Connect Heated HosePressure Check Hose Close Gun Fluid Manifold Valves a and BConnect Whip Hose to Gun Fluid Manifold Load Fluid with Feed Pumps Fluid Temperature Sensor FTS CalibrationInitial Startup A1 A2 A3 Digital Temperature ControllersTo change or enter the set point, proceed as follows To change to Celsius units To change back to Fahrenheit unitsHose Heat Manual Mode Over Temperature AlarmsFluid Heater Temperature Offset Supply Wet-Cups with Throat Seal Liquid Spraying Setup SpraySpray Adjustments Shutdown Daily Start-up Procedure OperationTi2414A Fluid Circulation Circulation Through ReactorCirculation Through Gun Manifold CKNMaintenance Technical Data Category DataTechnical Data 311511G Graco Standard Warranty Graco Information