Graco 311511G important safety instructions Component Identification, Typical Installation

Page 10

Component Identification

Component Identification

W

T

AD

AI

R

ti8447a

AK

AA

AH

S

DD

FF

GG

 

 

X

Z

ti8448a

 

 

 

 

 

AG

ti8481a

 

 

 

 

 

U

V

Y

 

 

 

 

 

FIG. 3: Typical Installation

10

311511G

Image 10
Contents Reactor A-20 Contents Related ManualsPart SystemsProportioner 50 ft 15 m 10 ft 3 m ApprovalsElectric Shock Hazard Fire and Explosion Hazard Moving Parts Hazard Typical Installation, without Circulation Key for FIGTypical Installation, with Circulation Isocyanate Hazard Moisture Sensitivity of IsocyanatesFoam Self-Ignition Keep Components a and B SeparateTypical Installation Component IdentificationKey Controls and Indicators AP Park/Run SwitchPressure Relief Procedure FlushingDetermine Power Source SetupLocate Reactor A-20 Electrical Requirements Configure to Supply Power Step One Connect Electrical CordPower Jumper Location Terminal BlocksFluid Supply Connections Iso Pump Lubrication System SetupGround System Air Supply ConnectionConnect FTS and Heated Dual Whip Hose Recirculation / Pressure Relief Lines Connect Heated HoseConnect Whip Hose to Gun Fluid Manifold Close Gun Fluid Manifold Valves a and BPressure Check Hose Initial Startup Fluid Temperature Sensor FTS CalibrationLoad Fluid with Feed Pumps To change or enter the set point, proceed as follows Digital Temperature ControllersA1 A2 A3 To change to Celsius units To change back to Fahrenheit unitsFluid Heater Temperature Offset Over Temperature AlarmsHose Heat Manual Mode Supply Wet-Cups with Throat Seal Liquid Spraying Setup SpraySpray Adjustments Shutdown Daily Start-up Procedure OperationTi2414A Fluid Circulation Circulation Through ReactorCirculation Through Gun Manifold CKNMaintenance Technical Data Category DataTechnical Data 311511G Graco Standard Warranty Graco Information