Graco 311511G Recirculation / Pressure Relief Lines, Connect Heated Hose

Page 19

Recirculation / Pressure Relief Lines

Do not install shutoffs downstream of the PRESSURE RELIEF/SPRAY valve outlets (BA, BB). The valves function as over pressure relief valves when set to SPRAY. Lines must be open so valves can automatically relieve pressure when machine is operating.

If circulating fluid back to the supply drums, use high pressure hose rated to withstand the maximum working pressure of this equipment.

If Recirculating to Supply Drum: Connect high pressure hose (R) to relief fittings (BA, BB) of both PRESSURE RELIEF/SPRAY valves. Route hose back to component A and B drums. Refer to manual 309852.

Alternate recirculation hoses (requires adapter fittings):

249508 - ISO (A) (moisture guard) red hose, 1/4 in. (6 mm) ID; #5 JIC fittings (m x f); 35 ft (10.7 m) long.

249509 - Resin (B) blue hose; 1/4 in. (6 mm) ID, #6 JIC fittings (m x f), 35 ft (10.7 m) long.

Setup

1.Turn main power OFF.

2.Assemble heated hose sections, FTS, and whip hose; see manual 309572.

3.Connect A and B hoses to A and B outlets on Reactor fluid manifold (FM). Hoses are color coded: red for component A (ISO), blue for component B (RES). Fittings are sized to prevent connection errors.

FM

VV

WW

ti8444a

Manifold hose fittings (VV, WW) allow use of 1/4 in. and 3/8 in. ID Reactor heated fluid hoses.

4.Connect cables (SS). Connect electrical connectors (NN). Be sure cables have slack when hose bends. Wrap cable and electrical connections with electrical tape.

R

BB

SS

 

BA

 

 

 

R

 

 

ti8441a

 

Connect Heated Hose

See manual 309572 for detailed instructions for

Graco heated hoses.

The fluid temperature sensor (FTS) and whip hose must be used with heated hose; see page 19. Hose length, including whip hose, must be 60 ft (18.3 m) minimum.

NN

ti8444a

311511G

19

Image 19
Contents Reactor A-20 Related Manuals ContentsApprovals SystemsProportioner 50 ft 15 m 10 ft 3 m PartElectric Shock Hazard Fire and Explosion Hazard Moving Parts Hazard Key for FIG Typical Installation, without CirculationTypical Installation, with Circulation Keep Components a and B Separate Moisture Sensitivity of IsocyanatesFoam Self-Ignition Isocyanate HazardComponent Identification Typical InstallationKey AP Park/Run Switch Controls and IndicatorsFlushing Pressure Relief ProcedureDetermine Power Source SetupLocate Reactor A-20 Electrical Requirements Step One Connect Electrical Cord Configure to Supply PowerTerminal Blocks Power Jumper LocationAir Supply Connection Iso Pump Lubrication System SetupGround System Fluid Supply ConnectionsConnect FTS and Heated Dual Whip Hose Connect Heated Hose Recirculation / Pressure Relief LinesConnect Whip Hose to Gun Fluid Manifold Close Gun Fluid Manifold Valves a and BPressure Check Hose Initial Startup Fluid Temperature Sensor FTS CalibrationLoad Fluid with Feed Pumps To change or enter the set point, proceed as follows Digital Temperature ControllersA1 A2 A3 To change back to Fahrenheit units To change to Celsius unitsFluid Heater Temperature Offset Over Temperature AlarmsHose Heat Manual Mode Supply Wet-Cups with Throat Seal Liquid Spray Spraying SetupSpray Adjustments Shutdown Operation Daily Start-up ProcedureTi2414A Circulation Through Reactor Fluid CirculationCKN Circulation Through Gun ManifoldMaintenance Category Data Technical DataTechnical Data 311511G Graco Information Graco Standard Warranty